
Third-floor addition in Hassawi
Adding a third floor to an existing residential building in Hassawi starts with comprehensive assessment of the current structure and foundations. We verify bearing capacity, then prepare formwork, concrete, service runs and complete finishing for the new floor.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Hassawi contains residential buildings of two or three storeys on square or rectangular plots at medium density. When adding a third floor to a two-storey building, you must ensure that shallow foundations or piles can carry the extra load, especially if the soil is weak sand or clay. The work also requires municipality approval for the new height, and careful separation of services (water, electricity, drainage) to ensure the new units operate independently.
Hassawi is in Farwaniya governorate, a residential district of mid-rise apartment buildings on regular plots.
Most Hassawi buildings are built on shallow foundations or short piles due to the saturated sandy soil conditions.

What the work covers
Structural assessment through finished, permitted handover of the complete third floor.

Structural assessment
Columns, beams and foundations checked before any new load is added.

Drawings and permits
Architectural and structural drawings prepared and permit submitted to the municipality.

Concrete frame
Columns, beams and slab poured with heat-cured concrete to resist cracking.

Block walls
Block walls tied to the new frame with horizontal bond steel at every third course.

Rebar tie-in
Epoxy-anchored dowels core-drilled into existing columns where no starter bars project.

Insulation and finishing
New roof slab insulated and third floor finished to the agreed specification.
How it works.
First contact
Call or WhatsApp us describing the villa and its current floor count.
Structure check
Engineer visits to inspect existing columns, beams and rebar condition.
Design and permit
Architectural and structural drawings prepared and building permit obtained.
Construction
Concrete frame poured and block walls built under continuous engineering supervision.
Finishing and handover
Third floor fully finished and handed over with new roof slab insulated.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Third-floor addition
Other services in Hassawi
Questions about Third-floor addition in Hassawi
Call nowDoes the sandy soil in Hassawi allow adding a third floor to an existing building?
A detailed assessment is needed. Saturated sandy soil can be weak, so we require a complete geotechnical evaluation of the existing foundations and their capacity for the extra load. Foundation reinforcement or new piles may be necessary.
How are water and electricity services separated for new units on the third floor?
We run separate lines from the main electrical panel and existing water tank, with independent meters for each new unit. Drainage pipes are laid with regular slope to connect to the existing main drain below the building.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps