Second-floor addition in Farwaniya
Adding a second floor in Farwaniya to an older structure requires checking column and foundation capacity against current code standards. We assess the structural condition, then pour the new storey complete with walls and all services through final handover.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most older houses in Farwaniya were built in the 1980s and 1990s on simple concrete frames without thorough geotechnical studies. The columns typically have small cross-sections and foundations are shallow strips, meaning a second floor requires deep inspection and often foundation reinforcement through grouting or piling. Farwaniya's climate and high water table affect soil stability, so we take soil samples at different depths to ensure correct design of any new foundation work.
Farwaniya is a governorate in southern Kuwait near Farwaniya Hospital, containing mid-range residential houses with shallow foundations and simple frames.
The water table in Farwaniya is relatively high, requiring soil condition analysis before designing the second-floor foundations.

What the work covers
Column capacity check through to finished second-floor handover, every stage handled.

Existing structure check
Column and beam dimensions reviewed and visible rebar condition assessed.

Drawings and permits
Approved architectural and structural drawings prepared, municipality permit obtained.

Rebar tie-in to columns
Epoxy-anchored dowel bars core-drilled into existing columns for full structural continuity.

Reinforced concrete frame
Columns, beams and floor slab poured and water-cured to prevent heat cracking.

Block walls and roof slab
Block walls built and roof slab cast with thermal insulation against Kuwait's heat.

Full finishing
Electrical, plumbing, marble, tiling, gypsum and paint to a ready-to-occupy standard.
How it works.
First contact
Call or WhatsApp us to describe the project and arrange a site visit.
Site inspection
We visit, measure columns and review existing drawings if available.
Drawings and permit
Structural and architectural drawings prepared and municipality permit obtained.
Structural construction
Rebar tied in with epoxy, columns, beams and slab poured with water curing.
Finishing and handover
Walls, electrical, plumbing and full finishing completed, then formal handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Second-floor addition
Other services in Farwaniya
Questions about Second-floor addition in Farwaniya
Call nowCan my old house's foundations be reinforced from underground?
Yes, we use cement grouting beneath existing strip foundations to increase bearing capacity, but this requires detailed inspection first and municipality approval.
Do I need piles if the soil under my house is weak?
It may be necessary if soil samples show weakness at the depth of your existing foundations. We evaluate reinforcement options and recommend the best solution based on the geotechnical assessment.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.