
Second-floor addition in Hassawi
Adding a second floor to an existing residential building in Hassawi begins with comprehensive inspection of columns and foundations to assess their capacity for an additional storey. We prepare an approved structural calculation then carry out reinforcement and new construction.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Hassawi comprises mid-rise residential buildings, mostly four to six storeys built on limited plots in the 1980s and 1990s. Adding a floor to these buildings means reviewing column and foundation design that may be close-spaced and already loaded. We calculate the new floor's additional load per column, assess foundation settlement risk, and execute necessary reinforcement through concrete injection or pouring new concrete around the existing base. The municipality requires an approved consultant's sign-off on drawings and calculations before work starts.
Hassawi is in Farwaniya governorate, a district of relatively older residential buildings whose foundations may not have been originally designed for addition.
Buildings in Hassawi typically have square columns of 40 × 40 cm or 50 × 50 cm, with column spacing between 4 and 5 metres.

What the work covers
Column capacity check through to finished second-floor handover, every stage handled.

Existing structure check
Column and beam dimensions reviewed and visible rebar condition assessed.

Drawings and permits
Approved architectural and structural drawings prepared, municipality permit obtained.

Rebar tie-in to columns
Epoxy-anchored dowel bars core-drilled into existing columns for full structural continuity.

Reinforced concrete frame
Columns, beams and floor slab poured and water-cured to prevent heat cracking.

Block walls and roof slab
Block walls built and roof slab cast with thermal insulation against Kuwait's heat.

Full finishing
Electrical, plumbing, marble, tiling, gypsum and paint to a ready-to-occupy standard.
How it works.
First contact
Call or WhatsApp us to describe the project and arrange a site visit.
Site inspection
We visit, measure columns and review existing drawings if available.
Drawings and permit
Structural and architectural drawings prepared and municipality permit obtained.
Structural construction
Rebar tied in with epoxy, columns, beams and slab poured with water curing.
Finishing and handover
Walls, electrical, plumbing and full finishing completed, then formal handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Second-floor addition
Other services in Hassawi
Questions about Second-floor addition in Hassawi
Call nowDoes adding a floor to an existing building affect the old building's stability?
Yes, which is why we inspect the foundation and columns first. If foundations are already heavily loaded, we may need additional reinforcement or sub-foundation injection to ensure no further settlement occurs.
What is the typical timeframe for structural inspection and reinforcement before construction begins?
It depends on building size and reinforcement scope. Inspection typically takes two to three weeks, and reinforcement may take additional weeks depending on the type of work required.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps