What the installation covers
Hands-on installation from base preparation through pressure testing to a working tank ready for use

Concrete base preparation
Raising the tank off the roof prevents corrosion and allows airflow beneath

Fill line from pump
PPR line run from the ground transfer pump with a float valve fitted

Distribution and pressure line
Main outlet line feeds all floors with consistent, stable water pressure

Isolation and drain valves
Valves on inlet and outlet lines allow servicing without cutting pipes

Tank thermal insulation
Insulating wrap shields the tank from intense roof heat and keeps water cooler

Pressure test and commissioning
Full joint and pressure check carried out before the tank is handed over
Materials and methods used
Multi-layer polyethylene tank
UV-resistant, rust-free, available in sizes that pass through standard roof access hatches
Heat-fused PPR pipework
Thermal fusion joints eliminate leaking sockets and the pipe does not react with Kuwait's alkaline water
Polyurethane foam wrap insulation
Wrapped around the tank and exposed pipes to slow heat gain during summer months
Brass ball valves
Withstand high water pressure and hard water without the early failure of plastic valves
Common mistakes in roof tank installation
Uneven or weak base
A full tank is very heavy; a tilted base cracks the tank body and breaks pipe joints
Undersized float valve
A small float valve fills the tank too slowly and overworks the transfer pump
Exposed pipes left uninsulated
Bare roof pipes absorb direct heat and deliver scalding water to taps on lower floors
Skipping the pressure test
One weak joint can show as a hidden wall leak weeks after the installation is complete
More in water tank installation.
What goes wrong with most plumbing.
Plumbing problems start hidden and end with breaking tiles. These three cost the most.
01Pipes laid in a rush
Pipework rushed before the walls close stays hidden until it starts to leak.
02Leaks you cannot see
A slow leak behind tiles shows up as damp, stains and a higher water bill.
03Nobody answers in an emergency
A burst pipe at night cannot wait for a contractor who has moved on.
The solution?
Pipework, leak detection and maintenance from one licensed company.

Pipes laid in a rushFirst-fix plumbing by the builder
Laid as part of the build, before the walls close.

Leaks you cannot seeWater leak detection
We find the source first.

Nobody answers in an emergency24-hour emergency plumber
Plus regular maintenance contracts after handover.
How it works.
First contact
Call or WhatsApp us with the property location and number of floors
Roof survey
A technician visits to assess the base, access and existing pipework
Quote and approval
We provide a clear quote covering tank, pipes, insulation and all fittings
Installation and connection
We prepare the base, fix the tank and connect all PPR lines and valves
Testing and handover
Pressure is tested and the float valve checked before final handover
What sets the price.
No fixed price list exists and these factors shape every quote for this job
Get a quoteTank size and material
Stainless steel costs more than polyethylene at the same capacity
Roof surface and access
Difficult roof access or a base that needs rebuilding adds labour time and cost
Pipework run length
A longer run between pump and tank means more PPR pipe and more fittings
Existing network changes
Connecting to old galvanised iron pipework requires extra transition fittings and work
Number of roof tanks
A house needing two separate tanks for municipal and sweet water differs from one tank
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
Roof tank installation in Kuwait. We work across all six governorates of Kuwait: Capital, Hawalli, Farwaniya, Mubarak Al-Kabeer, Ahmadi, Jahra.
Official references: Ministry of Electricity and Water (water and drainage connections)
Questions, answered.
Call nowCan a roof tank work without a pressure pump?
Yes, in low buildings gravity pressure can feed lower floors adequately. In multi-storey houses a pressure pump is needed to maintain acceptable flow at the top floor.
What size roof tank suits a typical Kuwaiti family home?
Size depends on the number of residents, floors and daily water use. The technician calculates the right capacity during the site survey based on these factors.
Why does a roof tank lose water with no visible leak?
A faulty float valve often leaves the fill line open and water overflows through the overflow outlet. A leak on the buried outlet line far from the tank is another common cause.
Does sweet water roof tank installation differ from municipal water tank installation?
The method is similar but a sweet water tank connects to a separate fill line from the delivery tanker and needs an extra isolation valve to prevent mixing with the municipal supply.
Does Kuwait's mineral scale affect a roof tank?
Scale builds mainly on the float valve and fill inlet, slowing tank filling and stopping the valve from closing fully. Regular cleaning of the valve prevents this problem.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps