Roof tank installation in Kuwait - Qadisiya

Roof tank installation in Qadisiya

Roof tank installation in Qadisiya serves residential blocks of 8 to 10 storeys on medium-sized plots. We level the roof surface, mount the tank with bracing, and pressure-test it fully before handover as an operational system.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Qadisiya buildings are older residential blocks of 8 to 10 storeys with fairly wide roofs and light service loads. The concrete roofs need minor patching of cracks before we pour a new base for the tank. Tanks of 5,000 to 10,000 litre capacity suit the resident count, and rising pipes run up the outside walls on heavy brackets to handle movement and vibration from traffic on the street below.

Qadisiya is in the Capital governorate, an older residential area near the Kuwait Sports Club stadium.

Most Qadisiya tanks hold 5,000 to 10,000 litres, and 25 mm rising pipes are sufficient for pressure delivery across mid-rise floors.

Back to Roof tank installation

See also: Water tank installation in Qadisiya

What the installation covers - Roof tank installation

What the installation covers

Hands-on installation from base preparation through pressure testing to a working tank ready for use

  • Concrete base preparation

    Raising the tank off the roof prevents corrosion and allows airflow beneath

  • Fill line from pump

    PPR line run from the ground transfer pump with a float valve fitted

  • Distribution and pressure line

    Main outlet line feeds all floors with consistent, stable water pressure

  • Isolation and drain valves

    Valves on inlet and outlet lines allow servicing without cutting pipes

  • Tank thermal insulation

    Insulating wrap shields the tank from intense roof heat and keeps water cooler

  • Pressure test and commissioning

    Full joint and pressure check carried out before the tank is handed over

How it works.

  1. First contact

    Call or WhatsApp us with the property location and number of floors

  2. Roof survey

    A technician visits to assess the base, access and existing pipework

  3. Quote and approval

    We provide a clear quote covering tank, pipes, insulation and all fittings

  4. Installation and connection

    We prepare the base, fix the tank and connect all PPR lines and valves

  5. Testing and handover

    Pressure is tested and the float valve checked before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Roof tank installation in Qadisiya

Call now
Do you patch roof cracks before installing the tank?

Yes, we inspect and clean the concrete roof, patch minor cracks with cement mortar, then pour the new tank base on a sound surface.

How long does pressure testing take before filling the tank with water?

We pressure-test the tank and all pipes at full operating pressure for 30 minutes to spot leaks, then wait 24 hours before filling with fresh water.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works