
Roof tank installation in Ardhiya Industrial
Roof tank installation in Ardhiya Industrial serves factories and warehouses needing independent, reliable water supply. We build an isolated base away from industrial fumes and pressure-test the tank at full load before operation.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Ardhiya warehouse and factory rooftops are wide and flat, but the tank's concrete foundation needs protection from industrial fumes and dust with an isolation layer. Tanks here are larger, 30 to 50 cubic metres or more, so we inspect the roof structure with the engineer before installing. Water runs from the tank are distributed to multiple points in the factory or warehouse via a horizontal network on the roof, with isolation and filter valves fitted before hydrostatic testing.
Ardhiya Industrial is in Farwaniya governorate, a zone designated for large factories and warehouses.
Industrial roof tanks in Ardhiya need inspection openings at least 60 centimetres in diameter for periodic maintenance and cleaning.

What the installation covers
Hands-on installation from base preparation through pressure testing to a working tank ready for use

Concrete base preparation
Raising the tank off the roof prevents corrosion and allows airflow beneath

Fill line from pump
PPR line run from the ground transfer pump with a float valve fitted

Distribution and pressure line
Main outlet line feeds all floors with consistent, stable water pressure

Isolation and drain valves
Valves on inlet and outlet lines allow servicing without cutting pipes

Tank thermal insulation
Insulating wrap shields the tank from intense roof heat and keeps water cooler

Pressure test and commissioning
Full joint and pressure check carried out before the tank is handed over
How it works.
First contact
Call or WhatsApp us with the property location and number of floors
Roof survey
A technician visits to assess the base, access and existing pipework
Quote and approval
We provide a clear quote covering tank, pipes, insulation and all fittings
Installation and connection
We prepare the base, fix the tank and connect all PPR lines and valves
Testing and handover
Pressure is tested and the float valve checked before final handover
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Roof tank installation
Other services in Ardhiya Industrial
Questions about Roof tank installation in Ardhiya Industrial
Call nowDoes a large roof tank need extra roof bracing?
Yes, we review the structural calculations with the engineer and add metal bracing if needed to distribute the full tank weight across the building's load-bearing columns.
How do we protect the base from industrial fumes and dust?
We apply an epoxy-resin isolation coat on the concrete under the tank, which prevents fumes and moisture from corroding the concrete and joints.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps