Roof tank installation in Kuwait - Abbasiya

Roof tank installation in Abbasiya

Roof tank installation in Abbasiya serves villas and apartment blocks on plots of varying sizes. We set a solid base and pressure-test to deliver a tank ready for immediate operation.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abbasiya is a residential zone mixing villas on small and medium plots with apartment blocks of four to six storeys. Roof tanks on villas serve a few units, while those on larger buildings need complex bases and distribution pipes with steady pressure. A roof may host one large tank or two smaller ones depending on demand, and each case requires separate study of load capacity, available space and existing risers.

Abbasiya is located in Farwaniya governorate, a residential area mixing villas and apartment blocks with varied roof types.

Abbasiya apartment buildings typically require tanks of 20 to 40 cubic metre capacity to serve multiple-floor units.

Back to Roof tank installation

See also: Water tank installation in Abbasiya

What the installation covers - Roof tank installation

What the installation covers

Hands-on installation from base preparation through pressure testing to a working tank ready for use

  • Concrete base preparation

    Raising the tank off the roof prevents corrosion and allows airflow beneath

  • Fill line from pump

    PPR line run from the ground transfer pump with a float valve fitted

  • Distribution and pressure line

    Main outlet line feeds all floors with consistent, stable water pressure

  • Isolation and drain valves

    Valves on inlet and outlet lines allow servicing without cutting pipes

  • Tank thermal insulation

    Insulating wrap shields the tank from intense roof heat and keeps water cooler

  • Pressure test and commissioning

    Full joint and pressure check carried out before the tank is handed over

How it works.

  1. First contact

    Call or WhatsApp us with the property location and number of floors

  2. Roof survey

    A technician visits to assess the base, access and existing pipework

  3. Quote and approval

    We provide a clear quote covering tank, pipes, insulation and all fittings

  4. Installation and connection

    We prepare the base, fix the tank and connect all PPR lines and valves

  5. Testing and handover

    Pressure is tested and the float valve checked before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Roof tank installation in Abbasiya

Call now
Can two smaller tanks be installed instead of one large tank on the roof?

Yes, and sometimes it is preferable depending on roof space and distributed load available. We connect the two tanks via shared or separate pipes based on distribution and drainage needs.

How is consistent water pressure maintained in a multi-storey apartment building?

We install a pressure regulator or centrifugal pump on the distribution line directly below the tank to control flow and ensure water reaches all floors at consistent pressure.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works