Roof tank installation in Kuwait - Qibla

Roof tank installation in Qibla

Roof tank installation in Qibla serves apartment and mixed-use buildings near Gulf Road and dense commercial zones. We prepare the concrete base and structural supports, then install the tank and conduct pressure testing before handover.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Qibla buildings are multi-storey apartment blocks 8 to 12 floors high on small plots with limited roof area. The tank must be hoisted carefully via stairwell or small crane, and the base needs precise levelling because any tilt transfers uneven pressure to the tank walls. Also, connecting the rising pipes from the ground storage tank requires correct height measurements to ensure gravity-fed water flow.

Qibla lies in Capital governorate, a district of dense apartment buildings near Gulf Road and Seif Palace.

Most Qibla roofs accommodate only one or two tanks side by side, requiring a concrete base 15 to 20 centimetres thick.

Back to Roof tank installation

See also: Water tank installation in Qibla

What the installation covers - Roof tank installation

What the installation covers

Hands-on installation from base preparation through pressure testing to a working tank ready for use

  • Concrete base preparation

    Raising the tank off the roof prevents corrosion and allows airflow beneath

  • Fill line from pump

    PPR line run from the ground transfer pump with a float valve fitted

  • Distribution and pressure line

    Main outlet line feeds all floors with consistent, stable water pressure

  • Isolation and drain valves

    Valves on inlet and outlet lines allow servicing without cutting pipes

  • Tank thermal insulation

    Insulating wrap shields the tank from intense roof heat and keeps water cooler

  • Pressure test and commissioning

    Full joint and pressure check carried out before the tank is handed over

How it works.

  1. First contact

    Call or WhatsApp us with the property location and number of floors

  2. Roof survey

    A technician visits to assess the base, access and existing pipework

  3. Quote and approval

    We provide a clear quote covering tank, pipes, insulation and all fittings

  4. Installation and connection

    We prepare the base, fix the tank and connect all PPR lines and valves

  5. Testing and handover

    Pressure is tested and the float valve checked before final handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Roof tank installation in Qibla

Call now
How do we hoist the tank to a tall building's roof without damage?

We use strong securing ropes and friction guards at any bends, and if the stairwell is too narrow we hire an external mini-crane. The weight of the filled tank is verified before hoisting to confirm structural safety.

What checks must be done right after the tank is installed?

We fill the tank with water and monitor for leaks from walls or connections for one hour, and check the inlet pressure from the ground tank matches the roof height.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works