
Roof tank installation in Hassawi
Roof tank installation in Hassawi serves residential and mixed-use buildings needing independent water supply separate from the main network. We set the tank on a fully supported base and pressure-test it to be ready for immediate use.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Hassawi is a district of 4 to 6-storey residential buildings and some mixed commercial buildings, with mid-sized roofs suited to tanks of 15 to 25 cubic metres. The concrete foundation is poured on the roof slab with a small gap underneath for drainage and to avoid water pooling. Service runs drop from the tank through planned openings in roofs and walls, coordinated with lower-floor occupants to avoid damage. Pressure and overflow valves are installed before hydrostatic testing to ensure system safety.
Hassawi is in Farwaniya governorate, a medium-density residential district with mixed-use buildings.
Hassawi tanks rarely exceed 25 cubic metres capacity, making them easier to hoist onto roofs through existing stairwells and openings.

What the installation covers
Hands-on installation from base preparation through pressure testing to a working tank ready for use

Concrete base preparation
Raising the tank off the roof prevents corrosion and allows airflow beneath

Fill line from pump
PPR line run from the ground transfer pump with a float valve fitted

Distribution and pressure line
Main outlet line feeds all floors with consistent, stable water pressure

Isolation and drain valves
Valves on inlet and outlet lines allow servicing without cutting pipes

Tank thermal insulation
Insulating wrap shields the tank from intense roof heat and keeps water cooler

Pressure test and commissioning
Full joint and pressure check carried out before the tank is handed over
How it works.
First contact
Call or WhatsApp us with the property location and number of floors
Roof survey
A technician visits to assess the base, access and existing pipework
Quote and approval
We provide a clear quote covering tank, pipes, insulation and all fittings
Installation and connection
We prepare the base, fix the tank and connect all PPR lines and valves
Testing and handover
Pressure is tested and the float valve checked before final handover
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Roof tank installation
Other services in Hassawi
Questions about Roof tank installation in Hassawi
Call nowDo the tank connections affect lower-floor apartments?
Pipes may need openings through walls and slabs between floors. We coordinate with residents beforehand and seal the openings precisely after installation to prevent moisture and noise.
How long does tank testing take before handover?
Hydrostatic testing typically runs for 24 hours after the tank is filled. We monitor pressure and level, inspect joints and the base, then hand it over ready for use.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps