
Roof tank installation in Hateen
Roof tank installation in Hateen requires careful assessment of the roof's load capacity and solid concrete base preparation before the tank is lifted into place. We test all connections and pressure immediately after installation to ensure the system is ready for use.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most residences in Hateen are older villas and apartment buildings with limited-thickness concrete roofs. Before installation, we run a load test on the roof and position the tank to distribute its weight onto main columns. We prepare a 40, 50 cm deep base sealed with bituminous waterproofing before hoisting the tank with safe lifting equipment.
Hateen is located in Hawalli governorate, a residential area with older varied-height buildings whose roof levels are at moderate elevations.
Hateen roofs typically support no more than 400 kg/m² additional live load, which determines the tank size selection.

What the installation covers
Hands-on installation from base preparation through pressure testing to a working tank ready for use

Concrete base preparation
Raising the tank off the roof prevents corrosion and allows airflow beneath

Fill line from pump
PPR line run from the ground transfer pump with a float valve fitted

Distribution and pressure line
Main outlet line feeds all floors with consistent, stable water pressure

Isolation and drain valves
Valves on inlet and outlet lines allow servicing without cutting pipes

Tank thermal insulation
Insulating wrap shields the tank from intense roof heat and keeps water cooler

Pressure test and commissioning
Full joint and pressure check carried out before the tank is handed over
How it works.
First contact
Call or WhatsApp us with the property location and number of floors
Roof survey
A technician visits to assess the base, access and existing pipework
Quote and approval
We provide a clear quote covering tank, pipes, insulation and all fittings
Installation and connection
We prepare the base, fix the tank and connect all PPR lines and valves
Testing and handover
Pressure is tested and the float valve checked before final handover
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Roof tank installation
Other services in Hateen
Questions about Roof tank installation in Hateen
Call nowCan a large roof tank be installed on an old villa roof?
Yes, but we must first test the roof's load capacity, and may need to strengthen the supporting columns or select a smaller tank based on the test result.
How long after pouring the base should we wait before lifting the tank?
The concrete base needs at least 7 days to cure fully before any load is applied; we run a pressure test on the tank immediately after installation.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps