Third-floor addition in Kuwait - Daiya

Third-floor addition in Daiya

Adding a third floor in Daiya begins with comprehensive assessment of the existing structure and verification of concrete and steel integrity. We assign an engineer to oversee reassessment and new design through to handover of the complete, approved third floor.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Daiya contains spacious residential villas on relatively large plots, mostly built in mid-decades with sturdy concrete frames and deep foundations. Buildings usually have two main storeys with a simple roof, and wide surrounding land allows for rearranging access points. The third-floor addition here focuses on calculating the extra load on existing columns and strengthening the bond between old and new frame, while maintaining the villa's structural balance.

Daiya is in Capital governorate, a quiet residential area near the British School of Kuwait.

Villas in Daiya typically have deep enough foundations to support an additional storey provided the load distribution on columns is recalculated.

Back to Third-floor addition

See also: Additional floor in Daiya

What the work covers - Third-floor addition

What the work covers

Structural assessment through finished, permitted handover of the complete third floor.

  • Structural assessment

    Columns, beams and foundations checked before any new load is added.

  • Drawings and permits

    Architectural and structural drawings prepared and permit submitted to the municipality.

  • Concrete frame

    Columns, beams and slab poured with heat-cured concrete to resist cracking.

  • Block walls

    Block walls tied to the new frame with horizontal bond steel at every third course.

  • Rebar tie-in

    Epoxy-anchored dowels core-drilled into existing columns where no starter bars project.

  • Insulation and finishing

    New roof slab insulated and third floor finished to the agreed specification.

How it works.

  1. First contact

    Call or WhatsApp us describing the villa and its current floor count.

  2. Structure check

    Engineer visits to inspect existing columns, beams and rebar condition.

  3. Design and permit

    Architectural and structural drawings prepared and building permit obtained.

  4. Construction

    Concrete frame poured and block walls built under continuous engineering supervision.

  5. Finishing and handover

    Third floor fully finished and handed over with new roof slab insulated.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Third-floor addition in Daiya

Call now
Can you add a third floor to a villa without demolishing the second storey?

Yes, if the structure and foundations are sound. We recalculate load distribution on existing columns and create reinforcement at the junction between the second storey and the new third floor.

How long does assessing the existing building take before third-floor work?

Typically one to two weeks depending on villa size and structural complexity. Assessment includes concrete and foundation sampling and soil testing around the structure.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works