
Rooftop floor addition in Daiya
Rooftop floor addition in Daiya begins with careful inspection of the concrete roof of existing residential buildings, then pouring the new slab with complete drainage network. We ensure foundations and columns can take the added load before starting.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Daiya has medium-rise residential blocks of 5 to 7 storeys on relatively spacious plots, and most roofs are reinforced concrete 22 to 28 centimetres thick. Before approving the addition, we order a full architectural survey measuring the roof, columns and any cracks, plus a structural report confirming foundation load capacity. After inspection and approval, we carefully remove waterproofing and asphalt, clean the surface, then pour the new slab with additional support columns if needed, and run first-grade pipes and drainage.
Daiya is in Capital governorate, a quiet residential area near Daiya Park and international schools.
Concrete roofs in Daiya are 22 to 28 centimetres thick and require a detailed structural report before addition.

What the work covers
Structural check of the existing roof through to handover of the finished rooftop floor.

Existing roof assessment
Check slab thickness, column capacity and load margin before any work starts.

Drawings and permits
Prepare structural and architectural drawings and obtain the municipality building permit.

Rebar tie-in to columns
Core-drill column tops and epoxy-anchor starter bars for the new frame.

Concrete frame and walls
Pour new columns, beams and roof slab with reinforced block infill walls.

New roof insulation
Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

Full finishing
Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.
How it works.
First contact
Call or WhatsApp us to describe the house and current floor count.
Site visit
We visit to inspect the roof slab and columns and assess their load capacity.
Drawings and permit
We prepare structural and architectural drawings and handle the building permit.
Construction
Tie rebar to existing columns, pour frame and slab, raise walls and roof.
Finishing and handover
Complete all finishes on the new floor then hand over with final drawings.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Rooftop floor addition
Other services in Daiya
Questions about Rooftop floor addition in Daiya
Call nowDo we need municipality approval before pouring the new floor?
Yes, we submit the new structural drawings and engineering report to the municipality and get building approval before removing waterproofing or pouring concrete. This ensures the building complies with local building codes.
What pipes and drainage do we use in the new floor?
We use copper or high-density polyethylene water pipes and clay or rigid vinyl drainage pipes. All routes separate clean from wastewater and slope gently to ensure natural flow toward sewers or collection tank.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps