
Third-floor addition in Abdullah Al-Salem
Third-floor addition on a checked structure in Abdullah Al-Salem begins with comprehensive assessment of columns, foundations and underlying soil. We measure current and additional stresses, then execute the new frame and all finishes through to final handover.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Buildings in Abdullah Al-Salem are middle-aged, mostly built in the 1980s and 1990s on relatively deep foundations and columns with adequate cross-sections. The suburb is laid out in regular grid with spacious plots, so space allows for stairwell and partition walls of the third floor in logical sequence. However, the new storey's weight affects older foundations, so we test soil as deep as possible and calculate potential settlement before pouring.
Abdullah Al-Salem suburb is in Kuwait's Capital governorate, home to uniform residential buildings on spacious plots near the British Embassy area.
Most Abdullah Al-Salem buildings were originally designed for two or three storeys, with foundations typically extending 1.5 metres or more below grade.

What the work covers
Structural assessment through finished, permitted handover of the complete third floor.

Structural assessment
Columns, beams and foundations checked before any new load is added.

Drawings and permits
Architectural and structural drawings prepared and permit submitted to the municipality.

Concrete frame
Columns, beams and slab poured with heat-cured concrete to resist cracking.

Block walls
Block walls tied to the new frame with horizontal bond steel at every third course.

Rebar tie-in
Epoxy-anchored dowels core-drilled into existing columns where no starter bars project.

Insulation and finishing
New roof slab insulated and third floor finished to the agreed specification.
How it works.
First contact
Call or WhatsApp us describing the villa and its current floor count.
Structure check
Engineer visits to inspect existing columns, beams and rebar condition.
Design and permit
Architectural and structural drawings prepared and building permit obtained.
Construction
Concrete frame poured and block walls built under continuous engineering supervision.
Finishing and handover
Third floor fully finished and handed over with new roof slab insulated.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Third-floor addition
Other services in Abdullah Al-Salem
Questions about Third-floor addition in Abdullah Al-Salem
Call nowCan older foundations support an extra floor without reinforcement?
We assess each case carefully. If foundations are deep, soil is good, and expected settlement is minimal, reinforcement may not be needed. Otherwise, we widen footings or add piles beneath.
How long does the structural assessment take before starting the third floor?
Assessment includes concrete and soil testing plus structural calculations, taking a few weeks depending on building size. We do not start work until we have written engineering approval in hand.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps