
Second-floor addition in Funaitees
Adding a second floor to an existing structure in Funaitees requires thorough inspection of column and foundation capacity to carry the added load. We review the original building design and recalculate stresses before raising any walls or pouring a new slab.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most residential buildings in Funaitees were built with shallow foundations and columns of ordinary concrete, designed for one or two floors only. When adding a second floor, we test the concrete sections of existing columns and concrete strength through site testing, and ensure the foundations can accept the new load. Municipal regulations also require prior approval of the revised structural calculations and amended design drawings before work begins.
Funaitees is located in Mubarak Al-Kabeer governorate, where small to medium residential buildings sit on individual plots.
We conduct non-destructive concrete testing on existing columns before issuing clearance for the second-floor addition.

What the work covers
Column capacity check through to finished second-floor handover, every stage handled.

Existing structure check
Column and beam dimensions reviewed and visible rebar condition assessed.

Drawings and permits
Approved architectural and structural drawings prepared, municipality permit obtained.

Rebar tie-in to columns
Epoxy-anchored dowel bars core-drilled into existing columns for full structural continuity.

Reinforced concrete frame
Columns, beams and floor slab poured and water-cured to prevent heat cracking.

Block walls and roof slab
Block walls built and roof slab cast with thermal insulation against Kuwait's heat.

Full finishing
Electrical, plumbing, marble, tiling, gypsum and paint to a ready-to-occupy standard.
How it works.
First contact
Call or WhatsApp us to describe the project and arrange a site visit.
Site inspection
We visit, measure columns and review existing drawings if available.
Drawings and permit
Structural and architectural drawings prepared and municipality permit obtained.
Structural construction
Rebar tied in with epoxy, columns, beams and slab poured with water curing.
Finishing and handover
Walls, electrical, plumbing and full finishing completed, then formal handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Second-floor addition
Other services in Funaitees
Questions about Second-floor addition in Funaitees
Call nowHow do you verify that existing columns can carry an additional floor?
We take concrete samples using non-destructive field tests and review the original building drawings to determine column diameter and rebar count. We then recalculate stresses with the added load to confirm capacity.
Do foundations need reinforcement when adding a floor?
Usually yes. We inspect the site soil and existing foundation depth, and if capacity is insufficient, we widen the foundations or add deep anchoring rods to transfer the additional load to firm soil layers.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps