
Additional floor in Funaitees
Adding an additional floor in Funaitees involves adding a storey to an existing house following comprehensive assessment of the current structure's load capacity. We evaluate core structural elements, then execute the required engineering modifications.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Funaitees has a mix of modern and older villas on medium-sized plots. Modern villas often have deep foundations and columns sized to carry two or more storeys, while older villas may have shallower foundations and thinner columns. During assessment, we inspect the soil type beneath the foundation, spacing between columns and beam thickness, as these factors determine whether a new floor can safely be added.
Funaitees lies near Mubarak Al-Kabeer governorate, where residential villas are spread across separate plots.
Funaitees villas typically have floor heights starting from 3 metres and reaching up to 3.6 metres depending on age and design.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Funaitees
Questions about Additional floor in Funaitees
Call nowAre newer villas in Funaitees safe for adding a floor?
Most newer villas are safe, but we need a full engineering inspection first. We measure columns, foundation and beams and verify the rebar before giving approval.
What reinforcements are typically needed for an older villa?
We may need to add new columns beside the existing ones, or strengthen the foundation through underpinning techniques beneath the current foundation. Each case differs based on structural condition.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps