
Third-floor addition in Funaitees
Adding a third floor in Funaitees starts with a complete assessment of the existing frame's condition and capacity to support an extra storey. We execute construction and finishing in compliance with the municipality's approved permit.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Funaitees homes are typically medium-sized plots with two storeys built in the 1990s and early 2000s on mixed clayey soil. The relatively modern frame is usually stronger than in older areas, but clay soil requires special attention to foundation settlement due to clay expansion and shrinkage. We inspect the footings and depth to ensure the additional storey is not affected, and consult the engineer on the need for foundation reinforcement or raising the existing footings.
Funaitees is in Mubarak Al-Kabeer governorate, a residential area of detached family homes near Mubarak Al-Kabeer centre.
The clayey soil in Funaitees requires adequate foundation depth and settlement study before adding any new storey.

What the work covers
Structural assessment through finished, permitted handover of the complete third floor.

Structural assessment
Columns, beams and foundations checked before any new load is added.

Drawings and permits
Architectural and structural drawings prepared and permit submitted to the municipality.

Concrete frame
Columns, beams and slab poured with heat-cured concrete to resist cracking.

Block walls
Block walls tied to the new frame with horizontal bond steel at every third course.

Rebar tie-in
Epoxy-anchored dowels core-drilled into existing columns where no starter bars project.

Insulation and finishing
New roof slab insulated and third floor finished to the agreed specification.
How it works.
First contact
Call or WhatsApp us describing the villa and its current floor count.
Structure check
Engineer visits to inspect existing columns, beams and rebar condition.
Design and permit
Architectural and structural drawings prepared and building permit obtained.
Construction
Concrete frame poured and block walls built under continuous engineering supervision.
Finishing and handover
Third floor fully finished and handed over with new roof slab insulated.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Third-floor addition
Other services in Funaitees
Questions about Third-floor addition in Funaitees
Call nowDoes clayey soil affect the feasibility of building a third floor?
Yes, clay soil expands and shrinks, which can cause uneven settlement. We inspect the current foundation depth and consult the engineer on whether the footings need reinforcement or deepening before the storey addition.
How long does structural assessment take before approving the addition?
Assessment involves site visit, measurement, sampling and laboratory tests. The timeframe depends on the home's size and testing complexity, and is coordinated by the consulting engineer.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps