
Second-floor addition in Abu Hasaniya
Adding a second floor to an existing villa in Abu Hasaniya begins with a thorough inspection of the original foundations, columns and soil. We confirm the current frame can support the full second-floor slab before pouring and finishing.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Abu Hasaniya is a district of detached villas on medium to large plots, mostly built 20 to 30 years ago in traditional villa style with concrete columns and standard foundations. Soil here is clayey with sandy layers, and older structures often lack detailed soil reports or kept structural drawings. When adding a floor, we run test pits to understand current soil layers and the condition of existing foundations, and assess whether the original columns (usually 35×35 or 40×40) need strengthening. Adjacent buildings require protection and concurrent monitoring during excavation and pouring.
Abu Hasaniya is in Mubarak Al-Kabeer governorate, an older coastal villa district on medium-sized plots.
Villas in Abu Hasaniya typically have columns measuring 35×35 or 40×40 cm with design loads of 400 to 500 kN per column.

What the work covers
Column capacity check through to finished second-floor handover, every stage handled.

Existing structure check
Column and beam dimensions reviewed and visible rebar condition assessed.

Drawings and permits
Approved architectural and structural drawings prepared, municipality permit obtained.

Rebar tie-in to columns
Epoxy-anchored dowel bars core-drilled into existing columns for full structural continuity.

Reinforced concrete frame
Columns, beams and floor slab poured and water-cured to prevent heat cracking.

Block walls and roof slab
Block walls built and roof slab cast with thermal insulation against Kuwait's heat.

Full finishing
Electrical, plumbing, marble, tiling, gypsum and paint to a ready-to-occupy standard.
How it works.
First contact
Call or WhatsApp us to describe the project and arrange a site visit.
Site inspection
We visit, measure columns and review existing drawings if available.
Drawings and permit
Structural and architectural drawings prepared and municipality permit obtained.
Structural construction
Rebar tied in with epoxy, columns, beams and slab poured with water curing.
Finishing and handover
Walls, electrical, plumbing and full finishing completed, then formal handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Second-floor addition
Other services in Abu Hasaniya
Questions about Second-floor addition in Abu Hasaniya
Call nowCan an older villa carry a second floor without foundation strengthening?
The original foundations may not be adequate if the villa was designed for one floor. We test the soil and foundations with test pits and calculate current capacity, then determine if strengthening is necessary.
How do you protect neighbouring villas during excavation and pouring for the second floor?
We erect protective barriers around the work site and monitor cracks and movement in neighbouring foundations throughout excavation and pouring. We stop work at any sign of damage to adjacent structures.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps