Second-floor addition in Kuwait - Adan

Second-floor addition in Adan

Adding a second floor to an existing villa in Adan starts with a detailed inspection of the original structure's capacity to bear the new load. We review all drawings and calculations, then perform necessary strengthening or modification before pouring and handover.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Adan is a residential district with villas of varying ages, some from the 1970s and 1980s with simple concrete frames, others newer. The older villas were often built to lower load standards with shallow footings, so adding a storey requires excavating around the existing foundations, soil testing, and precise engineering calculations to determine if strengthening is feasible.

Adan is located in Mubarak Al-Kabeer governorate on a seafront near Adan Hospital.

Most older villas in Adan require soil and foundation testing before approval to add a storey.

Back to Second-floor addition

See also: Additional floor in Adan

What the work covers - Second-floor addition

What the work covers

Column capacity check through to finished second-floor handover, every stage handled.

  • Existing structure check

    Column and beam dimensions reviewed and visible rebar condition assessed.

  • Drawings and permits

    Approved architectural and structural drawings prepared, municipality permit obtained.

  • Rebar tie-in to columns

    Epoxy-anchored dowel bars core-drilled into existing columns for full structural continuity.

  • Reinforced concrete frame

    Columns, beams and floor slab poured and water-cured to prevent heat cracking.

  • Block walls and roof slab

    Block walls built and roof slab cast with thermal insulation against Kuwait's heat.

  • Full finishing

    Electrical, plumbing, marble, tiling, gypsum and paint to a ready-to-occupy standard.

How it works.

  1. First contact

    Call or WhatsApp us to describe the project and arrange a site visit.

  2. Site inspection

    We visit, measure columns and review existing drawings if available.

  3. Drawings and permit

    Structural and architectural drawings prepared and municipality permit obtained.

  4. Structural construction

    Rebar tied in with epoxy, columns, beams and slab poured with water curing.

  5. Finishing and handover

    Walls, electrical, plumbing and full finishing completed, then formal handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Second-floor addition in Adan

Call now
Can the foundations of a villa from the 1970s be strengthened?

It is possible in many cases, but depends on soil type and the depth of the original footings. We run detailed tests to determine the best solution.

What if the foundations cannot be strengthened?

In rare cases we may install new deep foundations or pile supports beside the existing footings, depending on the engineering assessment.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works