
Second-floor addition in Abu Fatira
Adding a second floor to an existing house or apartment block in Abu Fatira begins with thorough structural inspection of foundations, columns and concrete strength. We verify current bearing capacity, then execute necessary reinforcement and safe pouring of the additional floor.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Abu Fatira is a mixed residential zone of villas on 500, 800 m² plots and small apartment blocks of three to four floors, mostly built decades ago to design standards older than the current code. When adding a second floor, we must inspect strip or isolated foundations and assess column capacity for additional loads. The soil is sandy-silty, and gradual settlement is possible especially under shallow foundations. We plan localised reinforcement and monitor vertical and horizontal cracks throughout the project.
Abu Fatira is located in Mubarak Al-Kabeer governorate, a residential area with older villas and small apartment buildings.
We inspect strip foundations and columns through structural survey before approving any new-floor addition.

What the work covers
Column capacity check through to finished second-floor handover, every stage handled.

Existing structure check
Column and beam dimensions reviewed and visible rebar condition assessed.

Drawings and permits
Approved architectural and structural drawings prepared, municipality permit obtained.

Rebar tie-in to columns
Epoxy-anchored dowel bars core-drilled into existing columns for full structural continuity.

Reinforced concrete frame
Columns, beams and floor slab poured and water-cured to prevent heat cracking.

Block walls and roof slab
Block walls built and roof slab cast with thermal insulation against Kuwait's heat.

Full finishing
Electrical, plumbing, marble, tiling, gypsum and paint to a ready-to-occupy standard.
How it works.
First contact
Call or WhatsApp us to describe the project and arrange a site visit.
Site inspection
We visit, measure columns and review existing drawings if available.
Drawings and permit
Structural and architectural drawings prepared and municipality permit obtained.
Structural construction
Rebar tied in with epoxy, columns, beams and slab poured with water curing.
Finishing and handover
Walls, electrical, plumbing and full finishing completed, then formal handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Second-floor addition
Other services in Abu Fatira
Questions about Second-floor addition in Abu Fatira
Call nowDo you add a second floor to older homes without original drawings?
Yes. We inspect the site directly, measure columns, walls and foundations, take concrete samples, then produce a detailed structural survey to replace missing drawings before designing reinforcement.
How long does the inspection phase take before pouring begins?
It depends on the building size and foundation condition. Inspections and structural survey typically take one to two weeks, then results are analysed and engineering sign-off is given before any reinforcement or pouring begins.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps