
Rooftop floor addition in Sharq
Adding a rooftop floor to an existing structure in Sharq begins with a full inspection of the current roof and its capacity for additional loads. We reassess the foundations, columns and beams, then execute the new floor with complete finishes and service installations.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Residential and mixed-use buildings in Sharq are typically five to eight storeys on medium-sized plots near Kuwait Towers. Before adding a rooftop floor, we sample the existing roof concrete to test its strength and review the original drawings if available to understand the structural system. If the roof was not designed for extra load, we add new bracing and columns. Most additions here require municipality approval and a building permit amendment.
Sharq is in the Capital governorate, a mixed commercial and residential district near Kuwait Towers and the Gulf waterfront.
Most Sharq buildings require concrete core sampling of the existing roof before designing the rooftop floor.

What the work covers
Structural check of the existing roof through to handover of the finished rooftop floor.

Existing roof assessment
Check slab thickness, column capacity and load margin before any work starts.

Drawings and permits
Prepare structural and architectural drawings and obtain the municipality building permit.

Rebar tie-in to columns
Core-drill column tops and epoxy-anchor starter bars for the new frame.

Concrete frame and walls
Pour new columns, beams and roof slab with reinforced block infill walls.

New roof insulation
Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

Full finishing
Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.
How it works.
First contact
Call or WhatsApp us to describe the house and current floor count.
Site visit
We visit to inspect the roof slab and columns and assess their load capacity.
Drawings and permit
We prepare structural and architectural drawings and handle the building permit.
Construction
Tie rebar to existing columns, pour frame and slab, raise walls and roof.
Finishing and handover
Complete all finishes on the new floor then hand over with final drawings.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Rooftop floor addition
Other services in Sharq
Questions about Rooftop floor addition in Sharq
Call nowHow do we verify the existing roof can support a new rooftop floor?
We take core samples from the existing roof and test them in the laboratory to determine their strength, review the original plans and calculate total loads. If the capacity is insufficient, we design additional bracing and columns.
Does adding a rooftop floor require municipality approval?
Yes, any floor addition requires municipality approval and an amended building permit. We submit the engineering drawings and structural test reports to the municipality before starting work.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps