Ground-floor construction in Sharq addresses mixed commercial and residential plots with limited heights near the Gulf. We set foundations, columns, walls and roof slab to carry upper floors, with separate service runs for water, electrical and drainage built into the first pour.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sharq plots range from 500 to 800 square metres and mix ground-level shops with residential units and offices. The ground frame relies on columns spaced 5 to 6 metres apart to carry multiple storeys above, and the slab pours at minimum 20 cm thickness to handle the load. We confirm the municipality approval for total building height and floor count before any foundation work, as the limits differ between coastal and inland zones.

Sharq lies in the Capital governorate, a mixed commercial and residential area near Kuwait Towers and Sharq Marina.

The ground slab requires a clear floor-to-floor height of at least 3.5 metres between ground and first floor per building code.

Back to Ground-floor construction

See also: Additional floor in Sharq

What the work covers - Ground-floor construction

What the work covers

Foundations through roof slab, with columns and walls ready to carry upper floors

  • Excavation and foundations

    Excavation to required depth and concrete footings suited to Kuwait's soil

  • Columns and beams

    Column sections sized to carry the planned number of upper floors

  • Block walls

    Internal and external concrete block walls after the frame is complete

  • Roof slab pour

    Reinforced concrete slab with starter bars projecting for the next floor

  • Drawings and permits

    Architectural and structural drawings and municipality permit before work starts

  • Insulation and finishing

    Foundation waterproofing and choice of full finishing or shell handover

How it works.

  1. First contact

    Call or WhatsApp to describe the project and arrange a site visit

  2. Site assessment

    Site visit to assess plot dimensions, soil conditions and planned floor count

  3. Drawings and permit

    Prepare architectural and structural drawings and obtain the municipality permit

  4. Frame construction

    Excavation, footings, columns, beams and slab poured with quality checks at each stage

  5. Handover and follow-up

    Handover as shell or finished floor, with waterproofing and starter bars reviewed before sign-off

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Ground-floor construction in Sharq

Call now
What slab thickness is needed for upper floors to be added?

The ground slab pours at minimum 20 cm thickness, based on structural load calculations and column spacing. Greater thickness may be required if columns are wider apart or upper floors carry heavier loads.

Can service pipes run through the ground floor slab?

Running pipes through the slab weakens its structure, so we route most services in horizontal ducts below ground level or along column walls from inside, keeping safe distance from reinforcement steel.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works