Second-floor addition in Sharq
Adding a second floor to an existing structure in Sharq requires checking whether the concrete columns can carry the additional load. We run field tests on the existing foundations and frame, then design and install new columns and beams, handing over the finished second floor ready for interior work.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Sharq has a mix of older and newer residential towers on medium-sized plots, many built on limited columns designed for only two or three storeys. Adding a fourth or fifth floor requires a full inspection of the foundations and column capacity to take the extra load, and may need partial reinforcement before pouring. The ground in Sharq is sandy with shallow groundwater, which affects the stability of the added structure, so we test the soil first before any new design.
Sharq is in the Capital governorate, a mixed residential and commercial district near Kuwait Towers and Sharq Marina.
We test the load-bearing capacity of existing columns before approving any additional load for the new floor.

What the work covers
Column capacity check through to finished second-floor handover, every stage handled.

Existing structure check
Column and beam dimensions reviewed and visible rebar condition assessed.

Drawings and permits
Approved architectural and structural drawings prepared, municipality permit obtained.

Rebar tie-in to columns
Epoxy-anchored dowel bars core-drilled into existing columns for full structural continuity.

Reinforced concrete frame
Columns, beams and floor slab poured and water-cured to prevent heat cracking.

Block walls and roof slab
Block walls built and roof slab cast with thermal insulation against Kuwait's heat.

Full finishing
Electrical, plumbing, marble, tiling, gypsum and paint to a ready-to-occupy standard.
How it works.
First contact
Call or WhatsApp us to describe the project and arrange a site visit.
Site inspection
We visit, measure columns and review existing drawings if available.
Drawings and permit
Structural and architectural drawings prepared and municipality permit obtained.
Structural construction
Rebar tied in with epoxy, columns, beams and slab poured with water curing.
Finishing and handover
Walls, electrical, plumbing and full finishing completed, then formal handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Second-floor addition
Other services in Sharq
Questions about Second-floor addition in Sharq
Call nowCan you add a floor to a building constructed twenty years ago?
Yes, but it requires a detailed inspection of the existing foundations and columns first. We take concrete samples and soil tests to confirm the structure can bear the new load before starting any work.
What if the existing columns cannot carry extra load?
We design localized reinforcement with additional columns or concrete wrapping of existing columns, then pour the new floor on the reinforced system. This increases lateral loads and requires an amended building permit from the municipality.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps