Rooftop floor addition in Kuwait - Jaber Al-Ahmad City

Rooftop floor addition in Jaber Al-Ahmad City

Building a rooftop floor on an existing structure in Jaber Al-Ahmad City relies on quick roof and column assessment since most buildings are recent and well-engineered. We review original drawings and verify existing reinforcement to ensure the new storey meets standards.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Jaber Al-Ahmad City is a modern residential development with buildings constructed to current code standards with documented monitored reinforcement. Most foundations are deep piles and columns are designed for potential additional load. Roof assessment is quicker because strength and steel are already on file in engineering records. We may only need computational verification that the frame can carry the extra storey within approved height limits.

Jaber Al-Ahmad City is in Capital governorate, a planned modern residential development.

New buildings in Jaber Al-Ahmad City have complete engineering files that simplify assessing frame load capacity.

Back to Rooftop floor addition

See also: Additional floor in Jaber Al-Ahmad City

What the work covers - Rooftop floor addition

What the work covers

Structural check of the existing roof through to handover of the finished rooftop floor.

  • Existing roof assessment

    Check slab thickness, column capacity and load margin before any work starts.

  • Drawings and permits

    Prepare structural and architectural drawings and obtain the municipality building permit.

  • Rebar tie-in to columns

    Core-drill column tops and epoxy-anchor starter bars for the new frame.

  • Concrete frame and walls

    Pour new columns, beams and roof slab with reinforced block infill walls.

  • New roof insulation

    Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

  • Full finishing

    Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.

How it works.

  1. First contact

    Call or WhatsApp us to describe the house and current floor count.

  2. Site visit

    We visit to inspect the roof slab and columns and assess their load capacity.

  3. Drawings and permit

    We prepare structural and architectural drawings and handle the building permit.

  4. Construction

    Tie rebar to existing columns, pour frame and slab, raise walls and roof.

  5. Finishing and handover

    Complete all finishes on the new floor then hand over with final drawings.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop floor addition in Jaber Al-Ahmad City

Call now
Are modern building designs in the city already sized for potential rooftop additions?

Usually yes. Modern designs often account for additional load. We review original engineering files and confirm the frame can support the new storey without major reinforcement.

How fast is roof inspection in a modern building versus an old one?

Much faster. New buildings have complete files with known concrete and steel. A simple check confirms integrity. Old buildings require sampling and testing.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works