Additional floor in Kuwait - Sharq

Additional floor in Sharq

Adding a floor in Sharq requires critical assessment of foundations and columns, especially in older buildings near the Gulf and Kuwait Towers. We evaluate the existing structure's condition, obtain necessary approvals, then execute reinforcement and pouring as one coordinated job.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Sharq districts contain a mix of older villas on tight plots and mid-rise buildings. Villas here were often built on shallow foundations due to high groundwater near the sea, so adding a floor requires careful review of depth and capacity. Newer buildings may have stronger frames but still need full inspection, and all work is carried out under licensed structural engineering supervision.

Sharq sits in the Capital governorate on the Gulf coast, where Kuwait Towers and the historic Sharq Marina stand among residential and commercial buildings.

Shallow foundations due to high groundwater require a separate geotechnical consultation before designing the additional floor.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Sharq

Call now
Why is groundwater inspection important when adding a floor in Sharq?

High groundwater near the sea affects foundation bearing capacity and expected settlement. We measure groundwater levels and calculate permeability factors to ensure the new design is safe from excessive settlement.

Are the columns in older villas sufficient for an extra floor?

They are rarely sufficient without reinforcement. We test column diameter, concrete and steel quality, and usually apply carbon-fibre strengthening or add parallel columns to safely transfer additional loads.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works