
Additional floor in Sharq
Adding a floor in Sharq requires critical assessment of foundations and columns, especially in older buildings near the Gulf and Kuwait Towers. We evaluate the existing structure's condition, obtain necessary approvals, then execute reinforcement and pouring as one coordinated job.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Sharq districts contain a mix of older villas on tight plots and mid-rise buildings. Villas here were often built on shallow foundations due to high groundwater near the sea, so adding a floor requires careful review of depth and capacity. Newer buildings may have stronger frames but still need full inspection, and all work is carried out under licensed structural engineering supervision.
Sharq sits in the Capital governorate on the Gulf coast, where Kuwait Towers and the historic Sharq Marina stand among residential and commercial buildings.
Shallow foundations due to high groundwater require a separate geotechnical consultation before designing the additional floor.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Sharq
Questions about Additional floor in Sharq
Call nowWhy is groundwater inspection important when adding a floor in Sharq?
High groundwater near the sea affects foundation bearing capacity and expected settlement. We measure groundwater levels and calculate permeability factors to ensure the new design is safe from excessive settlement.
Are the columns in older villas sufficient for an extra floor?
They are rarely sufficient without reinforcement. We test column diameter, concrete and steel quality, and usually apply carbon-fibre strengthening or add parallel columns to safely transfer additional loads.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps