Rooftop floor addition in Kuwait - Khalidiya

Rooftop floor addition in Khalidiya

Adding a rooftop floor to a verified existing structure in Khalidiya starts with a full inspection of the current roof and calculation of its load-bearing capacity. We assess the complete structural system then build the new floor with all finishes and services.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Residential and mixed-use buildings in Khalidiya range from five to seven storeys on medium-sized plots near Khalidiya Park. Most were built at different periods, so design and construction standards vary. Before adding a floor, we test roof concrete samples and calculate load distribution on columns and foundations. If the existing roof is inadequate, we design a new support system. All rooftop additions require municipality approval and permit amendment.

Khalidiya is in the Capital governorate, a residential area near Khalidiya Park and local amenities.

Concrete strength testing of the existing roof and load calculation precedes any rooftop floor design.

Back to Rooftop floor addition

See also: Additional floor in Khalidiya

What the work covers - Rooftop floor addition

What the work covers

Structural check of the existing roof through to handover of the finished rooftop floor.

  • Existing roof assessment

    Check slab thickness, column capacity and load margin before any work starts.

  • Drawings and permits

    Prepare structural and architectural drawings and obtain the municipality building permit.

  • Rebar tie-in to columns

    Core-drill column tops and epoxy-anchor starter bars for the new frame.

  • Concrete frame and walls

    Pour new columns, beams and roof slab with reinforced block infill walls.

  • New roof insulation

    Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

  • Full finishing

    Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.

How it works.

  1. First contact

    Call or WhatsApp us to describe the house and current floor count.

  2. Site visit

    We visit to inspect the roof slab and columns and assess their load capacity.

  3. Drawings and permit

    We prepare structural and architectural drawings and handle the building permit.

  4. Construction

    Tie rebar to existing columns, pour frame and slab, raise walls and roof.

  5. Finishing and handover

    Complete all finishes on the new floor then hand over with final drawings.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop floor addition in Khalidiya

Call now
Do we need to demolish the existing roof to add a new floor?

No, the existing roof remains as the base for the new floor if testing confirms its strength. We add waterproofing and protection layers, then build the new columns and beams on top.

How many concrete samples do we need to test the roof?

We take multiple samples distributed across different roof areas to ensure reliable results. The number depends on roof size and building age.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works