

What the installation covers
Measuring the opening, setting the frame, hanging the door, and fitting all hardware to completion

Opening survey
Precise measurement confirms the opening is square before any work starts

Frame preparation
Level timber frame set and packed into the wall opening securely

Door hanging
Door hung on hinges with even gaps checked on all four sides

Lock and handle fit
Mortise lock and handle routed and fitted with latch plate aligned

Gap sealing
Rubber draught seals fitted around the frame to block dust and humidity

Frame finishing
Architrave fixed and the joint between frame and wall made good
Signs you need a new door installation
Door drags on the frame
Intense summer heat swells the timber until forcing the door open damages the frame and paint
Visible gap around the door
Fine dust lines appear on the floor at the door base even when the door is fully shut
Frame is rotted or split
Coastal humidity breaks down an old timber frame until it can no longer hold hinges firmly
New door does not fit the opening
Replacing a door without re-surveying the opening leaves uneven gaps or prevents proper closing
Common mistakes in door installation
Out-of-plumb frame
A frame set without a spirit level causes the door to swing open or refuse to stay shut
Undersized hinges
Hinges rated for a light door will sag under a solid-core door and distort the frame over time
Skipping draught seals
Omitting rubber seals around the frame lets Kuwait's fine dust filter through every gap continuously
Misaligned latch plate
A latch that does not meet the strike plate cleanly lifts or twists the door on every closing
More in doors & windows.
What goes wrong with most finishing.
The finish is what you see every day, and its mistakes do not hide. These three are the most common.
01A rushed finish
The finish is what you live with every day. Rushing it shows in every corner.
02Four contractors for one finish
Tiling, gypsum, paint and aluminium crews who never talk to each other.
03After-care that never comes
Once you have the keys, it is hard to find anyone to come back and fix what shows up.
The solution?
Full finishing, and maintenance after it, from one licensed company.

A rushed finishTurnkey finishing
Marble, tiling, gypsum and paint from one company.

Four contractors for one finishOne company for every trade
No gaps between the tiler, the gypsum crew and the painter.

After-care that never comesRegular maintenance after handover
And finishing on instalments if you need it.
How it works.
Call or whatsApp
Send photos of the opening and the door to describe the scope clearly
Site survey
We measure the opening, check the existing frame and note any remedial needs
Quotation and approval
A detailed quote listing timber spec and hardware is sent for your approval
Installation
Frame set, door hung, locks fitted and draught seals installed fully
Check and handover
Opening, closing and alignment are tested before the door is handed over
What sets the price.
No fixed rate applies; these factors determine the actual quote for each door
Get a quoteDoor type and thickness
Solid-core, hollow-core and part-glazed doors each require different framing and hardware
Existing opening condition
An out-of-square or damaged opening needs remedial work before the frame can be set
Timber specification
Moisture-resistant engineered timber costs more than standard softwood or MDF door blanks
Hardware and locks
Multi-point locks or stainless-steel handles raise the overall cost noticeably
Number of doors
Installing several doors in one project is priced differently from a single door visit
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
Wooden door installation in Kuwait. We work across all six governorates of Kuwait: Capital, Hawalli, Farwaniya, Mubarak Al-Kabeer, Ahmadi, Jahra.
Official references: Kuwait Fire Force (safety requirements in finishing work)
Questions, answered.
Call nowCan a wooden door be installed at an exterior entrance exposed directly to the sun?
Yes, but the door blank must be a stable engineered or hardwood timber with a UV-resistant finish. Untreated softwood exposed to direct Kuwaiti sun will crack and warp within a short time.
How many hinges does a heavy solid-core wooden door need?
A standard solid-core door typically requires 3 hinges spaced evenly. Very heavy doors may need 4. Correct spacing prevents the door from sagging and pulling the frame out of plumb over time.
What changes in the installation between an interior door and an exterior one?
An exterior door needs a deeper frame, heavier draught seals, and higher-security locks. All hardware must be corrosion-resistant because coastal humidity and heat attack standard steel fittings quickly.
Can a wooden door be installed in an older wall opening that is not perfectly level?
Minor variation is corrected by packing the frame before fixing it. If the opening is significantly out of square, some masonry adjustment may be needed first to ensure the door operates correctly.
Does the installation finish include treating the joint between the frame and the wall?
Yes, the architrave is fixed around the frame to cover that joint and any remaining gaps are filled. This detail matters both to stop dust accumulation and to give the installation a clean finished look.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps




