What the work covers
Full or partial bathroom strip-out covering floors, walls, sanitary fittings and ceiling finishes.

Floor tile breaking
Tiles and bed mortar lifted without damaging the structural slab below.

Wall tile stripping
Ceramic tiles and adhesive removed to expose the block wall surface.

Sanitary ware removal
WC, basin and shower unit disconnected with drain stubs capped off.

Gypsum ceiling removal
Suspended gypsum panels taken down to expose plumbing and AC lines above.

Selective partial breaking
Only the shower zone or one wall stripped while the rest stays intact.

Debris clearance
Broken tiles and rubble bagged and removed from site immediately after breaking.
Signs your bathroom needs stripping
Hollow or buckling tiles
Tapping reveals a hollow sound, meaning the waterproofing layer beneath has failed.
Damp patch on the ceiling below
A stain on the floor below signals active water passing through the screed and slab.
Corroded fittings and frames
Coastal salt and humidity corrode old metal fixtures beyond repair over time.
Cracking at wall and floor junctions
Joint cracks at wall bases let shower water work its way behind the tile layer.
Materials and methods used
Pneumatic chipping hammer
Breaks tile and mortar bed quickly while limiting vibration transferred to the structural slab.
Drain outlet caps
Temporary plugs seal drain stubs so rubble dust cannot enter the building drain network.
Dust containment sheeting
Heavy polythene sheets taped across the door opening keep breaking dust out of the rest of the unit.
Hand chisel for tight areas
Used around pipe stubs and tight corners where the power hammer cannot reach safely.
More in demolition & removal.
What goes wrong with most finishing.
The finish is what you see every day, and its mistakes do not hide. These three are the most common.
01A rushed finish
The finish is what you live with every day. Rushing it shows in every corner.
02Four contractors for one finish
Tiling, gypsum, paint and aluminium crews who never talk to each other.
03After-care that never comes
Once you have the keys, it is hard to find anyone to come back and fix what shows up.
The solution?
Full finishing, and maintenance after it, from one licensed company.

A rushed finishTurnkey finishing
Marble, tiling, gypsum and paint from one company.

Four contractors for one finishOne company for every trade
No gaps between the tiler, the gypsum crew and the painter.

After-care that never comesRegular maintenance after handover
And finishing on instalments if you need it.
How it works.
Call or whatsApp
Contact us to describe the bathroom and book a site visit.
Site inspection
Team inspects tiles, fittings and hidden pipe runs before work begins.
Preparation and protection
Drain stubs capped, dust sheets fixed, and water supply isolated.
Breaking and removal
Tiles, sanitary ware and plaster removed in agreed sequence with ongoing clearing.
Handover check
Stripped bathroom handed over clean and ready for waterproofing and new finish.
What sets the price.
No fixed rate applies; the quote depends on factors the team assesses on site before work starts.
Get a quoteBathroom size and area
Larger floor and wall tile area means more labour and more debris to remove.
Tile layer depth
Multiple tile layers laid one over another increase breaking time considerably.
Full strip or partial strip
Stripping only the shower zone costs less than clearing every surface in the room.
Site access conditions
Upper floors without a lift add time for carrying rubble bags down to street level.
Debris disposal requirement
Volume of broken tiles and removed sanitary ware affects haulage and disposal cost.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
Bathroom demolition in Kuwait. We work across all six governorates of Kuwait: Capital, Hawalli, Farwaniya, Mubarak Al-Kabeer, Ahmadi, Jahra.
Official references: Kuwait Fire Force (safety requirements in finishing work)
Questions, answered.
Call nowCan some sanitary fittings be kept in place during the strip-out?
Yes. Selective breaking targets specific areas only, such as the shower floor, while the WC or basin stays in place if access to adjacent surfaces does not require removing them.
How is the building's drain network protected from rubble during breaking?
All drain outlets are capped with temporary plugs before breaking starts, preventing tile dust and fragments from entering the drain pipes and causing a blockage downstream.
Does stripping always reveal a waterproofing failure beneath the tiles?
Not always, but older Kuwaiti bathrooms often reveal cracked or deteriorated membranes once tiles are off. The condition is documented as soon as surfaces are exposed so the waterproofing scope can be confirmed.
Can removed bathroom tiles be reused somewhere else?
Mechanical breaking usually cracks most tiles or leaves them with thick mortar backing. If specific tiles must be saved intact, the team needs to know in advance so manual removal tools are used instead.
Does stripping a bathroom in an apartment block require approval from building management?
Many Kuwaiti residential buildings require building management to be notified before breaking works, particularly regarding permitted working hours and noise. Checking with management before scheduling the job is advisable.