Bathroom demolition in Kuwait - Funaitees

Bathroom demolition in Funaitees

Bathroom demolition in Funaitees focuses on efficient removal of flooring, tiled walls and sanitary fixtures. The area has mid-rise residential buildings where tight apartments require special care to protect adjacent units.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees is a residential area in Mubarak Al-Kabeer with multi-storey buildings of tightly packed apartments and some small villas. Most buildings were built 15 to 20 years ago with standard interior finishes. When stripping the bathroom, we carefully remove ceramic and tile from walls and floors to avoid affecting adjacent structures, disconnect sanitary ware and strip plaster and paint, with focus on isolating water and dust from neighbouring units.

Funaitees lies in Mubarak Al-Kabeer governorate, a district of closely built residential buildings where walls are shared between adjacent units.

Apartments in Funaitees share party walls, which requires good water and dust containment during demolition to protect neighbours.

Back to Bathroom demolition

See also: Demolition & removal in Funaitees

What the work covers - Bathroom demolition

What the work covers

Full or partial bathroom strip-out covering floors, walls, sanitary fittings and ceiling finishes.

  • Floor tile breaking

    Tiles and bed mortar lifted without damaging the structural slab below.

  • Wall tile stripping

    Ceramic tiles and adhesive removed to expose the block wall surface.

  • Sanitary ware removal

    WC, basin and shower unit disconnected with drain stubs capped off.

  • Gypsum ceiling removal

    Suspended gypsum panels taken down to expose plumbing and AC lines above.

  • Selective partial breaking

    Only the shower zone or one wall stripped while the rest stays intact.

  • Debris clearance

    Broken tiles and rubble bagged and removed from site immediately after breaking.

How it works.

  1. Call or whatsApp

    Contact us to describe the bathroom and book a site visit.

  2. Site inspection

    Team inspects tiles, fittings and hidden pipe runs before work begins.

  3. Preparation and protection

    Drain stubs capped, dust sheets fixed, and water supply isolated.

  4. Breaking and removal

    Tiles, sanitary ware and plaster removed in agreed sequence with ongoing clearing.

  5. Handover check

    Stripped bathroom handed over clean and ready for waterproofing and new finish.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom demolition in Funaitees

Call now
How do you protect neighbouring units from water and dust?

We use plastic sheeting and protective flooring on party walls, and run local air extractors to minimise dust spread. We seal openings and gaps with temporary barriers to prevent water and dust seepage.

Can the bathroom be stripped without damaging the flat's main flooring?

Yes, we remove tile and ceramic only from the bathroom boundary and protect the main flooring during work. If old concrete substrate lies beneath the tile, we clean and prepare it for new tiling.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works