Bathroom demolition in Kuwait - Faiha

Bathroom demolition in Faiha

Bathroom demolition in Faiha serves relatively modern villas and residential apartments in a quiet neighbourhood of the Capital. We extract ceramic, fixtures and suspended ceilings cleanly and organize service line rerouting.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Faiha is characterized by detached villas and modern residential apartments with medium-sized bathrooms larger than older building stock, featuring gypsum ceilings, thin-set ceramic floors and contemporary brick walls. Stripping here involves careful removal of suspended ceilings to preserve the slab above, and extracting modern fixtures without damaging copper or flexible plastic pipes. We isolate all service lines and remove waste quickly to minimize downtime.

Faiha is located in the Capital governorate near Faiha Park, a district of quiet, contemporary villas and residential apartments.

Most modern Faiha bathrooms have suspended gypsum ceilings with service routes concealed within walls.

Back to Bathroom demolition

See also: Demolition & removal in Faiha

What the work covers - Bathroom demolition

What the work covers

Full or partial bathroom strip-out covering floors, walls, sanitary fittings and ceiling finishes.

  • Floor tile breaking

    Tiles and bed mortar lifted without damaging the structural slab below.

  • Wall tile stripping

    Ceramic tiles and adhesive removed to expose the block wall surface.

  • Sanitary ware removal

    WC, basin and shower unit disconnected with drain stubs capped off.

  • Gypsum ceiling removal

    Suspended gypsum panels taken down to expose plumbing and AC lines above.

  • Selective partial breaking

    Only the shower zone or one wall stripped while the rest stays intact.

  • Debris clearance

    Broken tiles and rubble bagged and removed from site immediately after breaking.

How it works.

  1. Call or whatsApp

    Contact us to describe the bathroom and book a site visit.

  2. Site inspection

    Team inspects tiles, fittings and hidden pipe runs before work begins.

  3. Preparation and protection

    Drain stubs capped, dust sheets fixed, and water supply isolated.

  4. Breaking and removal

    Tiles, sanitary ware and plaster removed in agreed sequence with ongoing clearing.

  5. Handover check

    Stripped bathroom handed over clean and ready for waterproofing and new finish.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom demolition in Faiha

Call now
Do you damage gypsum ceilings when removing them?

No, we disassemble ceilings gradually to keep the concrete slab above intact. We use low-vibration techniques to avoid cracking.

What do you do with old copper and flexible pipes?

We carefully disconnect them at joints and preserve sound pipes for reuse if possible. Metal waste is collected separately for recycling.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works