
Bathroom demolition in Firdous
Bathroom strip-out in Firdous includes breaking ceramic, flooring and finished ceiling and complete disconnection of all sanitary fittings. We leave concrete walls and floor clean and ready for new finishing.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Firdous is a district of relatively new villas on spacious plots, with modern bathroom designs featuring suspended ceilings, varied flooring and high-quality ceramic wall tiles. When stripping, we handle suspended plaster ceilings that may house thermal insulation or ventilation ducts, requiring careful removal of metal and wooden frames before breaking the plaster. Flooring may be marble or porcelain over concrete, adding weight to debris and requiring stronger removal equipment.
Firdous sits in Farwaniya governorate, a modern residential district of spacious villas near Firdous Co-op and the Sixth Ring Road.
Suspended ceilings in modern Firdous bathrooms typically contain insulation or ducting requiring safe disconnection before plaster breaking.

What the work covers
Full or partial bathroom strip-out covering floors, walls, sanitary fittings and ceiling finishes.

Floor tile breaking
Tiles and bed mortar lifted without damaging the structural slab below.

Wall tile stripping
Ceramic tiles and adhesive removed to expose the block wall surface.

Sanitary ware removal
WC, basin and shower unit disconnected with drain stubs capped off.

Gypsum ceiling removal
Suspended gypsum panels taken down to expose plumbing and AC lines above.

Selective partial breaking
Only the shower zone or one wall stripped while the rest stays intact.

Debris clearance
Broken tiles and rubble bagged and removed from site immediately after breaking.
How it works.
Call or whatsApp
Contact us to describe the bathroom and book a site visit.
Site inspection
Team inspects tiles, fittings and hidden pipe runs before work begins.
Preparation and protection
Drain stubs capped, dust sheets fixed, and water supply isolated.
Breaking and removal
Tiles, sanitary ware and plaster removed in agreed sequence with ongoing clearing.
Handover check
Stripped bathroom handed over clean and ready for waterproofing and new finish.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Bathroom demolition
Other services in Firdous
Questions about Bathroom demolition in Firdous
Call nowHow do you remove the suspended ceiling without damaging ventilation ducts?
We carefully disconnect metal and wooden framework first, then isolate ventilation ducts and pipes before breaking the plaster. This ensures the ventilation system for the bathroom and adjoining units stays intact.
Does removing marble or porcelain flooring take longer than removing standard ceramic?
Yes, marble and porcelain are heavier and harder to break than standard ceramic. We use stronger equipment to remove the flooring and break debris into transportable pieces.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps