Second-floor addition in Kuwait - Nasseem

Second-floor addition in Nasseem

Adding a second floor to a villa in Nasseem requires careful inspection of the structure and foundations to handle the new weight. We work with engineers to review the drawings and perform any necessary strengthening, then hand over the new storey complete.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Nasseem is an established residential area in Jahra with villas of mixed ages, some older and some mid-life. The villas are built on regular plots with conventional concrete foundations, many originally designed for one storey only or two at most. When a second floor is requested, we need a full inspection of the soil, footings and columns, and confirm that any addition stays within the maximum allowable total load.

Nasseem is located in Jahra governorate, a residential area with evenly sized plots.

Most older villas in Nasseem require soil testing and extended foundation inspection to determine their capacity to support a second storey.

Back to Second-floor addition

See also: Additional floor in Nasseem

What the work covers - Second-floor addition

What the work covers

Column capacity check through to finished second-floor handover, every stage handled.

  • Existing structure check

    Column and beam dimensions reviewed and visible rebar condition assessed.

  • Drawings and permits

    Approved architectural and structural drawings prepared, municipality permit obtained.

  • Rebar tie-in to columns

    Epoxy-anchored dowel bars core-drilled into existing columns for full structural continuity.

  • Reinforced concrete frame

    Columns, beams and floor slab poured and water-cured to prevent heat cracking.

  • Block walls and roof slab

    Block walls built and roof slab cast with thermal insulation against Kuwait's heat.

  • Full finishing

    Electrical, plumbing, marble, tiling, gypsum and paint to a ready-to-occupy standard.

How it works.

  1. First contact

    Call or WhatsApp us to describe the project and arrange a site visit.

  2. Site inspection

    We visit, measure columns and review existing drawings if available.

  3. Drawings and permit

    Structural and architectural drawings prepared and municipality permit obtained.

  4. Structural construction

    Rebar tied in with epoxy, columns, beams and slab poured with water curing.

  5. Finishing and handover

    Walls, electrical, plumbing and full finishing completed, then formal handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Second-floor addition in Nasseem

Call now
How long does structural inspection take before starting the second-floor addition?

Initial inspection typically takes one to two weeks, including visual survey, soil testing, and engineering calculations.

Does foundation strengthening significantly increase project costs?

Costs depend on the existing foundation condition. Our early inspection determines the actual strengthening need before major expenses begin.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works