
Third-floor addition in Nasseem
Adding a third floor in Nasseem starts with comprehensive inspection of the existing concrete structure to determine its true structural capacity. We assess foundations, columns and beams, then execute the addition under municipality and site engineer approval.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Nasseem is a residential neighbourhood in Jahra with villas and small apartment blocks on close plots, with a wide range of construction dates. Structural systems vary across building years, and some concrete frames may need careful re-inspection to confirm they are safe for addition. We examine every part of the structure carefully and request ultrasound or X-ray imaging if needed, and document every weak point before starting.
Nasseem is located in Jahra governorate, a residential area with buildings of varied ages on close plots.
We request certification from the original design engineer confirming structural soundness before any addition work begins.

What the work covers
Structural assessment through finished, permitted handover of the complete third floor.

Structural assessment
Columns, beams and foundations checked before any new load is added.

Drawings and permits
Architectural and structural drawings prepared and permit submitted to the municipality.

Concrete frame
Columns, beams and slab poured with heat-cured concrete to resist cracking.

Block walls
Block walls tied to the new frame with horizontal bond steel at every third course.

Rebar tie-in
Epoxy-anchored dowels core-drilled into existing columns where no starter bars project.

Insulation and finishing
New roof slab insulated and third floor finished to the agreed specification.
How it works.
First contact
Call or WhatsApp us describing the villa and its current floor count.
Structure check
Engineer visits to inspect existing columns, beams and rebar condition.
Design and permit
Architectural and structural drawings prepared and building permit obtained.
Construction
Concrete frame poured and block walls built under continuous engineering supervision.
Finishing and handover
Third floor fully finished and handed over with new roof slab insulated.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Third-floor addition
Other services in Nasseem
Questions about Third-floor addition in Nasseem
Call nowAre there special inspections needed for an older villa before adding a third floor?
Yes, we inspect for cracks, fractures, moisture and corrosion in steel and concrete. We may need X-rays or ultrasound to assess the internal quality of the concrete before the addition.
How long does the structural inspection take before construction starts?
It depends on building size and apparent condition. Basic inspection may take weeks to gather data and produce a report, after which we obtain municipality and engineer approvals.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps