Additional floor in Kuwait - Nasseem

Additional floor in Nasseem

Additional-floor work in Nasseem focuses on residential villas with lightweight frames and shallow foundations. We assess the existing building's load capacity and design new columns and beams that accommodate the added weight within local constraints.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Nasseem villas were built with half or quarter-span frames without detailed load studies, and foundations are often dowels or shallow foundations at limited depth. When adding a floor, we test current column capacity and underlying soil, and may need to strengthen foundations with added collars or concrete supports. Column spacing typically does not exceed 4 metres, allowing balanced beam design for the new floor without complete building re-engineering.

Nasseem sits in Jahra governorate, a relatively modern residential area of detached villas on medium-sized plots.

We determine whether shallow foundations need deepening or reinforcement before new frame work begins.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Nasseem

Call now
Can we add a floor to a villa without reinforcing the foundations?

It may be possible if soil is good and foundations adequate, but that is rare. We sample soil, inspect foundation depth and reinforcement, and often recommend limited reinforcement with concrete collars around existing columns.

What is the safe column spacing for a new floor?

Safe spacing depends on concrete strength, reinforcement and expected load. In Nasseem, we typically apply 3 to 4 metres based on existing frames and common local materials.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works