Rooftop floor addition in Kuwait - Abu Fatira

Rooftop floor addition in Abu Fatira

Rooftop floor addition on Abu Fatira villas and residential buildings begins with comprehensive structural inspection of the existing frame and roof. We verify structural integrity, then add the new floor with all utilities and finishes.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abu Fatira is a residential area with villas on spacious plots and multi-storey apartment buildings. Most structures were built in recent decades with varying maintenance levels. Villas typically have concrete roofs on few columns, while apartment buildings may have roofs designed for specific load limits. Structural inspection must cover concrete quality, rebar and current setbacks before new design begins.

Abu Fatira is located in Mubarak Al-Kabeer governorate, a growing residential neighbourhood with mixed villas and apartment buildings.

Most Abu Fatira villas and buildings were designed for a maximum of three storeys, and the existing roof may not carry additional load without reinforcement.

Back to Rooftop floor addition

See also: Additional floor in Abu Fatira

What the work covers - Rooftop floor addition

What the work covers

Structural check of the existing roof through to handover of the finished rooftop floor.

  • Existing roof assessment

    Check slab thickness, column capacity and load margin before any work starts.

  • Drawings and permits

    Prepare structural and architectural drawings and obtain the municipality building permit.

  • Rebar tie-in to columns

    Core-drill column tops and epoxy-anchor starter bars for the new frame.

  • Concrete frame and walls

    Pour new columns, beams and roof slab with reinforced block infill walls.

  • New roof insulation

    Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

  • Full finishing

    Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.

How it works.

  1. First contact

    Call or WhatsApp us to describe the house and current floor count.

  2. Site visit

    We visit to inspect the roof slab and columns and assess their load capacity.

  3. Drawings and permit

    We prepare structural and architectural drawings and handle the building permit.

  4. Construction

    Tie rebar to existing columns, pour frame and slab, raise walls and roof.

  5. Finishing and handover

    Complete all finishes on the new floor then hand over with final drawings.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop floor addition in Abu Fatira

Call now
What is the difference between inspecting a villa versus an apartment building before adding a floor?

A villa is usually simpler in structure with few columns and a flat roof. An apartment building requires detailed inspection of the foundation system, interior columns and load distribution because the addition affects multiple residential units.

Do we need municipality approval to add a rooftop floor to an old villa?

Yes, you must submit a licence modification request with engineering plans and structural inspection. The municipality will review the new design, setbacks and loads before approval.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works