
Third-floor addition in Qasr
Building a third floor in Qasr, Jahra requires precise inspection of existing concrete structures and verification of their adequacy. We assess foundations and columns, then obtain municipality approval to construct a complete floor with all services.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Qasr features two or three-storey villas on medium-sized plots, some older and some newer construction. Older villas need thorough checking of concrete foundations and columns for settlement or cracks before adding a floor. Newer villas have stronger frames but require original drawings and prior municipality approvals. Desert climate causes concrete expansion and contraction, so we account for this when designing the additional floor and tying it to the existing structure.
Qasr lies in Jahra governorate, a residential district of villas on medium plots away from the coast.
Original engineering reports for existing Qasr villas are often unavailable, so direct site inspection and concrete samples are needed to assess actual strength.

What the work covers
Structural assessment through finished, permitted handover of the complete third floor.

Structural assessment
Columns, beams and foundations checked before any new load is added.

Drawings and permits
Architectural and structural drawings prepared and permit submitted to the municipality.

Concrete frame
Columns, beams and slab poured with heat-cured concrete to resist cracking.

Block walls
Block walls tied to the new frame with horizontal bond steel at every third course.

Rebar tie-in
Epoxy-anchored dowels core-drilled into existing columns where no starter bars project.

Insulation and finishing
New roof slab insulated and third floor finished to the agreed specification.
How it works.
First contact
Call or WhatsApp us describing the villa and its current floor count.
Structure check
Engineer visits to inspect existing columns, beams and rebar condition.
Design and permit
Architectural and structural drawings prepared and building permit obtained.
Construction
Concrete frame poured and block walls built under continuous engineering supervision.
Finishing and handover
Third floor fully finished and handed over with new roof slab insulated.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Third-floor addition
Other services in Qasr
Questions about Third-floor addition in Qasr
Call nowCan a third floor be added to an older villa without original engineering reports?
Yes, we conduct a full on-site engineering inspection with concrete samples and steel testing, then produce a new report documenting the current frame's condition and supporting additional loading.
How do we address potential settlement in foundations of older villas in Qasr?
We level-check floors and columns with precision instruments and probe foundations with small test pits. If we find settlement, we treat it with grouting or underpinning before adding the new floor.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps