
Second-floor addition in Qasr
Adding a second floor to an existing building in Qasr requires careful assessment of the original frame strength and foundations. We verify column load capacity and soil conditions before pouring the second-floor slab, roof and final finishes.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Qasr in Jahra contains residential villas and small apartment blocks on medium-sized plots, mostly built 15 to 25 years ago to developed local building standards. Soil in the area is gravelly with thick clay layers, and foundations are typically standard reinforced concrete at 1.5 to 2 metres depth. When adding a floor, we need copies of the original reports if available, otherwise we conduct on-site test pits. Columns (usually 40×40 or 45×45) are recalculated under the added load and may need an additional concrete band around existing foundations to boost capacity.
Qasr is in Jahra governorate, a relatively older residential district with villas and small apartment blocks on medium-sized plots.
Foundations in Qasr are typically reinforced concrete at 1.5 to 2 metres depth per previous soil reports.

What the work covers
Column capacity check through to finished second-floor handover, every stage handled.

Existing structure check
Column and beam dimensions reviewed and visible rebar condition assessed.

Drawings and permits
Approved architectural and structural drawings prepared, municipality permit obtained.

Rebar tie-in to columns
Epoxy-anchored dowel bars core-drilled into existing columns for full structural continuity.

Reinforced concrete frame
Columns, beams and floor slab poured and water-cured to prevent heat cracking.

Block walls and roof slab
Block walls built and roof slab cast with thermal insulation against Kuwait's heat.

Full finishing
Electrical, plumbing, marble, tiling, gypsum and paint to a ready-to-occupy standard.
How it works.
First contact
Call or WhatsApp us to describe the project and arrange a site visit.
Site inspection
We visit, measure columns and review existing drawings if available.
Drawings and permit
Structural and architectural drawings prepared and municipality permit obtained.
Structural construction
Rebar tied in with epoxy, columns, beams and slab poured with water curing.
Finishing and handover
Walls, electrical, plumbing and full finishing completed, then formal handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Second-floor addition
Other services in Qasr
Questions about Second-floor addition in Qasr
Call nowDo old foundations in Qasr need deepening when adding a second floor?
Not necessarily. We first test the soil and current load with test pits, then calculate available additional capacity. If capacity is sufficient, we add a concrete band around the existing foundation. If deeper work is needed, we deepen specific sections.
How do you handle the gravelly and clayey soil on site during construction?
The gravelly soil provides good drainage, and the clay layer below offers high bearing capacity. We target foundations directly on the clay layer and manage water drainage around excavations during pouring.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps