Third-floor addition in Kuwait - Abbasiya

Third-floor addition in Abbasiya

Third-floor additions in Abbasiya begin with structural assessment of medium-height residential buildings, then design a new storey matching existing floor heights and depth. We deliver the complete floor with final municipal permit.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abbasiya is a dense residential area with apartment buildings of five to seven storeys, most built in past decades on closely spaced plots. The concrete structures in these buildings usually can handle one additional floor if the foundation and load-bearing walls are carefully assessed. Site access and local labour availability ease execution, but municipal rules require detailed structural reports and prior approval from the engineering department.

Abbasiya sits in Farwaniya governorate, a district of older apartment buildings on closely spaced plots near the old central market.

Most Abbasiya buildings were constructed with a storey height of about 3.2 metres, and the added floor must match this height for structural and aesthetic consistency.

Back to Third-floor addition

See also: Additional floor in Abbasiya

What the work covers - Third-floor addition

What the work covers

Structural assessment through finished, permitted handover of the complete third floor.

  • Structural assessment

    Columns, beams and foundations checked before any new load is added.

  • Drawings and permits

    Architectural and structural drawings prepared and permit submitted to the municipality.

  • Concrete frame

    Columns, beams and slab poured with heat-cured concrete to resist cracking.

  • Block walls

    Block walls tied to the new frame with horizontal bond steel at every third course.

  • Rebar tie-in

    Epoxy-anchored dowels core-drilled into existing columns where no starter bars project.

  • Insulation and finishing

    New roof slab insulated and third floor finished to the agreed specification.

How it works.

  1. First contact

    Call or WhatsApp us describing the villa and its current floor count.

  2. Structure check

    Engineer visits to inspect existing columns, beams and rebar condition.

  3. Design and permit

    Architectural and structural drawings prepared and building permit obtained.

  4. Construction

    Concrete frame poured and block walls built under continuous engineering supervision.

  5. Finishing and handover

    Third floor fully finished and handed over with new roof slab insulated.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Third-floor addition in Abbasiya

Call now
Are the older Abbasiya buildings strong enough for an added floor?

Most yes, with a thorough engineering assessment. We evaluate concrete, steel and foundation, and determine if any partial reinforcement is needed before adding the new floor.

How long do municipality approvals take for an Abbasiya third-floor addition?

We cannot set a fixed timeline, but you need a complete engineering report and approved drawings from a registered structural consultant, then submission to the municipality's engineering department.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works