Third-floor addition in Kuwait - Fintas

Third-floor addition in Fintas

Third-floor additions on Fintas coastal villas require special structural assessment accounting for humidity and salt corrosion. We deliver the new floor with final municipal approval and salt-resistant surface protection.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Fintas is a coastal district in Ahmadi governorate with luxury villas on medium plots near the beach. Sea humidity and salt attack concrete and steel, especially in foundations and exterior columns. Any added floor must use salt-resistant concrete and rust-treated steel, and maintain municipal setbacks from the shoreline. Strong sea winds require reinforced structural design for exterior walls.

Fintas sits in Ahmadi governorate, a luxury coastal district on the Gulf near the lagoons and public beach.

Coastal villas in Fintas sit at least 100 metres from the shoreline, and the municipality enforces special setbacks and additional marine protection for any additions.

Back to Third-floor addition

See also: Additional floor in Fintas

What the work covers - Third-floor addition

What the work covers

Structural assessment through finished, permitted handover of the complete third floor.

  • Structural assessment

    Columns, beams and foundations checked before any new load is added.

  • Drawings and permits

    Architectural and structural drawings prepared and permit submitted to the municipality.

  • Concrete frame

    Columns, beams and slab poured with heat-cured concrete to resist cracking.

  • Block walls

    Block walls tied to the new frame with horizontal bond steel at every third course.

  • Rebar tie-in

    Epoxy-anchored dowels core-drilled into existing columns where no starter bars project.

  • Insulation and finishing

    New roof slab insulated and third floor finished to the agreed specification.

How it works.

  1. First contact

    Call or WhatsApp us describing the villa and its current floor count.

  2. Structure check

    Engineer visits to inspect existing columns, beams and rebar condition.

  3. Design and permit

    Architectural and structural drawings prepared and building permit obtained.

  4. Construction

    Concrete frame poured and block walls built under continuous engineering supervision.

  5. Finishing and handover

    Third floor fully finished and handed over with new roof slab insulated.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Third-floor addition in Fintas

Call now
How do you protect the new structure from salt and sea humidity in Fintas?

We use concrete formulated with high salt resistance, rust-treated reinforcement steel, and a heavy-duty marine protective coating. The materials differ from standard construction.

Do municipality setbacks from the beach limit the size of the added floor?

Yes, coastal plots have strict setbacks from the shoreline, and the added floor must respect these limits. This may affect the footprint of the new construction.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works