Additional floor in Kuwait - Fintas

Additional floor in Fintas

Adding a floor to a house in Fintas starts with assessing the existing foundation and frame to determine load capacity. We design the structural reinforcement, submit plans to the municipality for approval, then upgrade columns and floors to carry the new level safely.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most houses in Fintas stand on medium-sized plots of 400 to 600 square metres, typically three storeys on sandy soil with a shallow water table. Adding a floor requires reassessing the existing foundations and columns; many homes need deeper footings or additional piles. We measure the existing rebar in columns and beams, calculate new stresses, then determine whether the current frame can take it or needs reinforcement through steel columns or concrete jacketing.

Fintas is in Ahmadi governorate, a coastal residential district of individual houses on medium plots near fishing areas and the beach.

We review the original soil report or conduct new foundation tests before designing the additional floor.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Fintas

Call now
Can sandy foundations in Fintas handle an additional floor on an existing house?

It depends on the depth of the current foundations and columns. We test the soil and frame, calculate new loads, and if needed, add piles or concrete reinforcement.

How long does assessment and reinforcement for an additional floor take?

Assessment and design typically take three to four weeks, municipality approval one to two weeks, and the reinforcement itself varies by the scope of work needed.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works