Additional floor in Fintas
Adding a floor to a house in Fintas starts with assessing the existing foundation and frame to determine load capacity. We design the structural reinforcement, submit plans to the municipality for approval, then upgrade columns and floors to carry the new level safely.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most houses in Fintas stand on medium-sized plots of 400 to 600 square metres, typically three storeys on sandy soil with a shallow water table. Adding a floor requires reassessing the existing foundations and columns; many homes need deeper footings or additional piles. We measure the existing rebar in columns and beams, calculate new stresses, then determine whether the current frame can take it or needs reinforcement through steel columns or concrete jacketing.
Fintas is in Ahmadi governorate, a coastal residential district of individual houses on medium plots near fishing areas and the beach.
We review the original soil report or conduct new foundation tests before designing the additional floor.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Fintas
Questions about Additional floor in Fintas
Call nowCan sandy foundations in Fintas handle an additional floor on an existing house?
It depends on the depth of the current foundations and columns. We test the soil and frame, calculate new loads, and if needed, add piles or concrete reinforcement.
How long does assessment and reinforcement for an additional floor take?
Assessment and design typically take three to four weeks, municipality approval one to two weeks, and the reinforcement itself varies by the scope of work needed.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.