
Rooftop floor addition in Fintas
Rooftop floor additions in Fintas face coastal conditions requiring careful inspection of corrosion and moisture in the existing structure. We verify concrete integrity and reinforcement, then construct the new storey with salt and humidity-resistant materials.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Fintas is a coastal area with mixed old and new apartment buildings, mostly three to five storeys with concrete roofs. Salt, moisture and coastal winds significantly affect concrete and reinforcement durability, especially on exposed roofs. Before starting a new floor, we inspect rust spread in columns and reinforcement and slab deterioration, and may need to remove degraded concrete and re-coat reinforcement. We use concrete with salt and humidity-resistant additives, and apply strong waterproofing to all new surfaces.
Fintas is in Ahmadi governorate, a coastal area in the south where roofs are exposed to sea salt and high humidity.
Reinforcement in Fintas coastal roofs may suffer surface or deep rust, so we inspect every structural element before approving the addition.

What the work covers
Structural check of the existing roof through to handover of the finished rooftop floor.

Existing roof assessment
Check slab thickness, column capacity and load margin before any work starts.

Drawings and permits
Prepare structural and architectural drawings and obtain the municipality building permit.

Rebar tie-in to columns
Core-drill column tops and epoxy-anchor starter bars for the new frame.

Concrete frame and walls
Pour new columns, beams and roof slab with reinforced block infill walls.

New roof insulation
Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

Full finishing
Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.
How it works.
First contact
Call or WhatsApp us to describe the house and current floor count.
Site visit
We visit to inspect the roof slab and columns and assess their load capacity.
Drawings and permit
We prepare structural and architectural drawings and handle the building permit.
Construction
Tie rebar to existing columns, pour frame and slab, raise walls and roof.
Finishing and handover
Complete all finishes on the new floor then hand over with final drawings.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Rooftop floor addition
Other services in Fintas
Questions about Rooftop floor addition in Fintas
Call nowDoes salt and moisture weaken older structures in Fintas?
Yes, reinforcement rusts and concrete degrades over time. Before the addition, we inspect rust depth and cracks, remove deteriorated sections and retreat the foundation before new construction.
Do you use different materials for the new floor in a coastal area?
Yes, we use concrete with salt and sulphate-resistant admixtures, reinforcement with thicker concrete cover, and strong waterproofing across all surfaces. This reduces salt and moisture impact long-term.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps