
Third-floor addition in Faiha
Adding a third floor to Faiha villas requires inspecting a sound structure and reviewing original soil reports. We assess column and foundation condition, evaluate load capacity for an additional storey, and submit an approved structural plan to the municipality.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Faiha villas typically sit on relatively spacious plots of 600 to 900 square metres, built to older architectural standards. Most were constructed over 20 years ago with concrete and rebar that may be weaker than current codes. We request original geotechnical and structural reports from the owner; if unavailable, we conduct a full site survey and sample the existing foundation to determine if it can bear the additional load.
Faiha is located in the Capital governorate, a quiet residential area with wide streets and spaced-out villas near Faiha Park.
Most Faiha villas use a column-and-beam system with spacing of around 4 to 5 metres, which provides good flexibility for adding a storey.

What the work covers
Structural assessment through finished, permitted handover of the complete third floor.

Structural assessment
Columns, beams and foundations checked before any new load is added.

Drawings and permits
Architectural and structural drawings prepared and permit submitted to the municipality.

Concrete frame
Columns, beams and slab poured with heat-cured concrete to resist cracking.

Block walls
Block walls tied to the new frame with horizontal bond steel at every third course.

Rebar tie-in
Epoxy-anchored dowels core-drilled into existing columns where no starter bars project.

Insulation and finishing
New roof slab insulated and third floor finished to the agreed specification.
How it works.
First contact
Call or WhatsApp us describing the villa and its current floor count.
Structure check
Engineer visits to inspect existing columns, beams and rebar condition.
Design and permit
Architectural and structural drawings prepared and building permit obtained.
Construction
Concrete frame poured and block walls built under continuous engineering supervision.
Finishing and handover
Third floor fully finished and handed over with new roof slab insulated.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Third-floor addition
Other services in Faiha
Questions about Third-floor addition in Faiha
Call nowDo we need municipality approval before starting the addition in Faiha?
Yes, we must submit approved structural drawings from a consulting engineer and obtain municipality approval. We handle these steps after completing the site engineering assessment.
If the plot's soil is weak, can we reinforce the foundation from the side?
Yes, we can install new piles or add concrete columns alongside the existing foundation, but this requires subsurface excavation and protection measures for the standing house during execution.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps