Additional floor in Faiha
Additional-floor work in Faiha starts with assessing the existing house structure and determining its capacity to carry new foundation, walls and columns. We examine the foundation depth, soil conditions, then design the new floor to carry its load safely without compromising the original house.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most Faiha houses stand on shallow foundations in sandy soil, many built in the 1980s and 1990s to older building standards. When an owner requests an additional floor, we first run a soil test and study the original house drawings if available, then calculate either reinforcing the existing foundation or adding new piles under the new storey. All of this requires a municipal permit before any side excavation or pouring begins.
Faiha sits in Capital governorate, a quiet residential district with parks and low-density housing co-ops.
Foundation depths in Faiha typically range from 1.5 to 2.5 metres, and the sandy soil requires a geotechnical test before design.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Faiha
Questions about Additional floor in Faiha
Call nowCan a new floor be added to an old house without breaking the existing foundation?
It depends on the foundation condition and soil. We may reinforce it externally with piles, or partial removal and re-pouring may be needed. We inspect first, then present design options.
How long from inspection to completion of the additional floor?
Inspection and reports take 2 to 3 weeks, design and approvals 1 month, construction 3 to 4 months depending on floor size and reinforcement scope.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps