Additional floor in Kuwait - Faiha

Additional floor in Faiha

Additional-floor work in Faiha starts with assessing the existing house structure and determining its capacity to carry new foundation, walls and columns. We examine the foundation depth, soil conditions, then design the new floor to carry its load safely without compromising the original house.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Faiha houses stand on shallow foundations in sandy soil, many built in the 1980s and 1990s to older building standards. When an owner requests an additional floor, we first run a soil test and study the original house drawings if available, then calculate either reinforcing the existing foundation or adding new piles under the new storey. All of this requires a municipal permit before any side excavation or pouring begins.

Faiha sits in Capital governorate, a quiet residential district with parks and low-density housing co-ops.

Foundation depths in Faiha typically range from 1.5 to 2.5 metres, and the sandy soil requires a geotechnical test before design.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Faiha

Call now
Can a new floor be added to an old house without breaking the existing foundation?

It depends on the foundation condition and soil. We may reinforce it externally with piles, or partial removal and re-pouring may be needed. We inspect first, then present design options.

How long from inspection to completion of the additional floor?

Inspection and reports take 2 to 3 weeks, design and approvals 1 month, construction 3 to 4 months depending on floor size and reinforcement scope.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works