A rooftop floor addition in Adan is built over existing houses and apartment blocks that must undergo thorough structural verification before work starts. We assess the existing frame details, then pour the new floor to applicable standards.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Adan features a mix of residential villas and mid-rise apartment blocks built over decades on plots of varying sizes. Many of these older buildings were constructed with materials and structural details less rigorous than modern codes, so careful inspection of foundations, load-bearing walls and existing slabs is needed. We assess slab thickness, rebar diameters and concrete condition before preparing the new rooftop floor.

Adan is located in Mubarak Al-Kabeer governorate, a residential coastal area of villas and apartment blocks near Adan Hospital.

We take samples from the existing slab to test concrete strength and verify adequacy of existing reinforcement.

Back to Rooftop floor addition

See also: Additional floor in Adan

What the work covers - Rooftop floor addition

What the work covers

Structural check of the existing roof through to handover of the finished rooftop floor.

  • Existing roof assessment

    Check slab thickness, column capacity and load margin before any work starts.

  • Drawings and permits

    Prepare structural and architectural drawings and obtain the municipality building permit.

  • Rebar tie-in to columns

    Core-drill column tops and epoxy-anchor starter bars for the new frame.

  • Concrete frame and walls

    Pour new columns, beams and roof slab with reinforced block infill walls.

  • New roof insulation

    Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

  • Full finishing

    Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.

How it works.

  1. First contact

    Call or WhatsApp us to describe the house and current floor count.

  2. Site visit

    We visit to inspect the roof slab and columns and assess their load capacity.

  3. Drawings and permit

    We prepare structural and architectural drawings and handle the building permit.

  4. Construction

    Tie rebar to existing columns, pour frame and slab, raise walls and roof.

  5. Finishing and handover

    Complete all finishes on the new floor then hand over with final drawings.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop floor addition in Adan

Call now
Can the older villas and apartment blocks in Adan support adding a new floor?

It depends on the condition of the foundations, load-bearing walls and existing slab. We conduct a detailed inspection and some buildings may need structural reinforcement before the addition can begin.

How do you handle old concrete and insufficient reinforcement?

We carefully assess concrete strength and reinforcement. If insufficient, we add strengthening or install load-transfer beams that safely distribute the new floor's weight across existing structural elements.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works