Additional floor in Kuwait - Adan

Additional floor in Adan

Additional-floor service in Adan assesses coastal residential villas with comprehensive foundation and frame evaluations under marine humidity conditions. We deliver detailed structural-feasibility reports before commencing work.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Villas in Adan face the sea and endure high humidity and salt spray, which corrode concrete and steel over time. During inspection we note signs of erosion and cracking in columns, beams and foundations. The soil here is sandy mixed with moisture, and groundwater levels can be uneven due to seepage. We order geotechnical and chemical testing of the soil and concrete to understand deterioration patterns, then design new sealing and protective systems before any floor lift begins.

Adan is in Mubarak Al-Kabeer governorate, a coastal residential area near Adan Hospital.

We require chloride and sulphate testing of soil and concrete in coastal villas before approving any construction work.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Adan

Call now
Does sea salt damage the integrity of old concrete columns?

Yes, salt penetrates concrete and corrodes embedded steel. We inspect columns with an endoscope and sample concrete cores to measure corrosion depth before approving a new floor.

How do you protect new foundations from marine moisture?

We use salt-resistant concrete, apply self-adhesive waterproof membranes and protective epoxy coatings against chloride penetration. We bond new work to old using epoxy injection for continuous sealing.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works