
Membrane roof waterproofing in Hassawi
Membrane waterproofing in Hassawi covers residential villas and small apartment buildings with varied-condition flat roofs. We inspect each roof, remove dirt and fine cracks, then lay the waterproofing membrane and carefully seal boundaries and openings.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Hassawi is a mix of older villas and small apartment buildings, each in different condition. Some roofs suffer from recurring water seepage due to high humidity and cracks; others are in fair condition but need protection. Roofs here are typically medium-sized, and we focus on inspecting vent openings, drains, perimeter walls and any prior cracks. Each weak point is treated with joint-filler and adhesive before membrane laying, because any weakness will lead to later seepage.
Hassawi is in Farwaniya governorate, a district of villas and apartment buildings with varied-condition roofs.
Pre-waterproofing roof inspection reveals fine cracks and prior seepage, essential before laying any membrane.

What the work covers
Substrate preparation, membrane laying and sealing every weak point through to handover.

Concrete preparation
Clean the deck, remove loose old layers and fill cracks before bonding.

Primer coat
Apply bituminous primer to ensure the membrane bonds firmly to the deck.

Torch application
Heat-weld each membrane roll to the deck for a full continuous bond.

Parapet edge sealing
Turn the membrane up parapet walls and seal edges with flexible flashing.

Drain collar detail
Bond and seal the membrane around each drain collar to stop water ingress.

Post-installation check
Inspect the full membrane, laps and details before the job is signed off.
How it works.
First contact
Call or WhatsApp us and describe the roof condition and leak symptoms.
Roof survey
We visit, inspect the deck, existing layers and all penetrations.
Quotation
We send a detailed quote covering membrane type, prep works and total cost.
Installation
Deck prep, primer, torch-welding rolls and sealing every edge and collar.
Check and handover
Full inspection of the completed membrane before final handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Membrane roof waterproofing
Other services in Hassawi
Questions about Membrane roof waterproofing in Hassawi
Call nowCan we waterproof an old roof suffering from recurring seepage?
Yes, we inspect the seepage source and cracks, thoroughly clean the surface, inject any deep cracks with sealant, then lay the new waterproofing membrane over the prepared surface.
How long does waterproofing a medium-sized roof take from prep to handover?
Surface preparation and cleaning takes one or two days depending on condition; membrane laying and sealing takes one or two more days; details and drying take additional time.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps