Membrane roof waterproofing in Kuwait - Jleeb Al-Shuyoukh

Membrane roof waterproofing in Jleeb Al-Shuyoukh

Membrane waterproofing in Jleeb Al-Shuyoukh focuses on cleaning the roof of dust, salt and cracked old layers, then laying a durable waterproofing roll with tight sealing at all joints. We seal every corner and opening with flexible sealant to prevent leakage.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Jleeb Al-Shuyoukh is a densely built residential area with apartment blocks on narrow plots and older crowded villas, with flat roofs exposed directly to intense heat, seasonal humidity and salt spray. Preparation here requires extra effort removing thick salt deposits and debris built up over years, needing vigorous scraping. After cleaning we carefully inspect for small cracks in the concrete that may leak later, filling them with flexible filler before laying the waterproofing membrane.

Jleeb Al-Shuyoukh is in Farwaniya governorate, a densely built residential area with exposed roofs where salt and dust accumulate heavily.

Concrete cracks wider than 3 mm must be filled with flexible filler before the waterproofing membrane is laid.

Back to Membrane roof waterproofing

See also: Roof waterproofing in Jleeb Al-Shuyoukh

What the work covers - Membrane roof waterproofing

What the work covers

Substrate preparation, membrane laying and sealing every weak point through to handover.

  • Concrete preparation

    Clean the deck, remove loose old layers and fill cracks before bonding.

  • Primer coat

    Apply bituminous primer to ensure the membrane bonds firmly to the deck.

  • Torch application

    Heat-weld each membrane roll to the deck for a full continuous bond.

  • Parapet edge sealing

    Turn the membrane up parapet walls and seal edges with flexible flashing.

  • Drain collar detail

    Bond and seal the membrane around each drain collar to stop water ingress.

  • Post-installation check

    Inspect the full membrane, laps and details before the job is signed off.

How it works.

  1. First contact

    Call or WhatsApp us and describe the roof condition and leak symptoms.

  2. Roof survey

    We visit, inspect the deck, existing layers and all penetrations.

  3. Quotation

    We send a detailed quote covering membrane type, prep works and total cost.

  4. Installation

    Deck prep, primer, torch-welding rolls and sealing every edge and collar.

  5. Check and handover

    Full inspection of the completed membrane before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Membrane roof waterproofing in Jleeb Al-Shuyoukh

Call now
How do you remove thick salt buildup on an old roof?

We use hand scraping and specialised power tools to remove thick salt deposits and hard debris, then rinse with water and blow dry with compressed air until all residue is gone.

What do you do with small cracks in the roof substrate before waterproofing?

We fill any cracks deeper than 3 mm with flexible cement filler or sealant and allow full curing, because cracks under the membrane cause localised leakage.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works