Membrane roof waterproofing in Kuwait - Abbasiya

Membrane roof waterproofing in Abbasiya

Membrane roof waterproofing in Abbasiya protects apartments and residential buildings from recurring water infiltration and moisture. We thoroughly clean and prepare the roof, lay the membrane precisely, and firmly seal all edges and openings.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Residential apartment buildings in Abbasiya are medium-rise on adjacent plots, most built in the 1970s-80s with old flat roofs needing maintenance. Old roofs are often layered with deteriorated sealant or cracked bitumen, and winter water leaks at stairwell-roof junctions and air-con openings are common. We strip all old layers to expose a sound concrete surface, then apply a flexible waterproofing membrane that withstands temperature swings and minor structural movement, and seal every corner and opening with pourable sealant.

Abbasiya sits in Farwaniya governorate, a relatively older residential neighbourhood of closely built mid-rise apartment buildings.

We strip old roofs down to a clean concrete surface before applying any new waterproofing membrane.

Back to Membrane roof waterproofing

See also: Roof waterproofing in Abbasiya

What the work covers - Membrane roof waterproofing

What the work covers

Substrate preparation, membrane laying and sealing every weak point through to handover.

  • Concrete preparation

    Clean the deck, remove loose old layers and fill cracks before bonding.

  • Primer coat

    Apply bituminous primer to ensure the membrane bonds firmly to the deck.

  • Torch application

    Heat-weld each membrane roll to the deck for a full continuous bond.

  • Parapet edge sealing

    Turn the membrane up parapet walls and seal edges with flexible flashing.

  • Drain collar detail

    Bond and seal the membrane around each drain collar to stop water ingress.

  • Post-installation check

    Inspect the full membrane, laps and details before the job is signed off.

How it works.

  1. First contact

    Call or WhatsApp us and describe the roof condition and leak symptoms.

  2. Roof survey

    We visit, inspect the deck, existing layers and all penetrations.

  3. Quotation

    We send a detailed quote covering membrane type, prep works and total cost.

  4. Installation

    Deck prep, primer, torch-welding rolls and sealing every edge and collar.

  5. Check and handover

    Full inspection of the completed membrane before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Membrane roof waterproofing in Abbasiya

Call now
Old roofs have cracks and multiple deteriorated layers, what is our first step?

We remove all old layers completely using mechanical and chemical tools as needed, exposing a clean, sound concrete surface before laying the new waterproofing membrane.

How do we treat water leakage at the roof-stairwell wall corner?

We seal the corner with flexible pourable sealant before laying the membrane, then lap the membrane up the wall midway and down onto the adjacent floor to fully contain water from all angles.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works