Wood parquet in Kuwait - Sharq

Wood parquet in Sharq

Wood parquet installation in Sharq requires sound substrate preparation and reliable adhesive bonding from the first board onward. This central Capital district features modern residential towers and villas with expansive floor areas.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most residential buildings in Sharq are newly built with flat concrete floors near sea level, but moisture from the nearby Gulf requires waterproofing treatment before any wood board goes down. We test concrete moisture content and treat it with a moisture barrier, then select an adhesive suited to the coastal climate. Boards are laid in uniform gaps and weighted with distributed loads until the adhesive cures fully, then the surface is sanded and sealed with a protective coat.

Sharq sits in Capital governorate, a district of modern residential buildings near Kuwait Towers and the Gulf waterfront.

Sharq's relative humidity is high due to coastal proximity, requiring a moisture barrier before parquet bonding begins.

Back to Wood parquet

See also: Parquet installation in Sharq

What the service covers - Wood parquet

What the service covers

board selection and substrate work through to the final sealed and cleaned floor

  • Substrate levelling

    grinding and levelling the floor so every board bonds flat and even

  • Moisture barrier

    barrier coat between concrete and wood boards to block rising moisture

  • Board installation

    glue-down fixing with gap control and alignment checked every row

  • Cutting and details

    precise cuts around columns, door frames and thresholds with no visible gaps

  • Sanding and finishing

    full-floor sanding followed by multiple lacquer coats to seal the surface

  • Final inspection

    checking every board for bond, level and finish before handover

How it works.

  1. Call or whatsApp

    describe the space, wood preference and any existing floor condition

  2. Site visit

    we measure the area, check substrate level and identify any moisture risk

  3. Quotation

    a detailed quote covering boards, adhesive, levelling and finishing coats

  4. Installation

    substrate levelling, moisture barrier, glue-down boards and lacquer finish

  5. Inspection and handover

    full floor check, cleaning and site handover to the client

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Wood parquet in Sharq

Call now
Is fresh concrete in the apartment ready straight away for parquet laying?

No, the concrete must cure fully and then its moisture content tested. In Sharq we apply a moisture barrier before laying boards to prevent moisture absorption from the nearby Gulf.

What spacing should be left between one parquet board and the next during laying?

We leave a small uniform gap between boards to allow wood expansion and contraction with humidity and temperature changes. This gap is covered later by the trim base.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works