Gypsum-board room in Kuwait - Qibla

Gypsum-board room in Qibla

Completed gypsum-board rooms in Qibla offer a fast way to partition residential units and offices in both older and newer buildings. We install the galvanised steel frame, boards, embedded services and paint-ready surface in one phase.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Qibla mixes mid-rise residential buildings with commercial units and offices on plots of varying sizes. Older units often need large rooms subdivided into smaller ones, while newer buildings need extra rooms for service areas or storage. When partitioning, we ensure electrical, water and ventilation runs meet the required clearances from the outer frame, and that boards are firmly screwed to the steel studs before surface preparation.

Qibla is in Capital governorate, a commercial and residential district near Gulf Road and Seif Palace.

Gypsum boards are set at a fixed distance from the steel studs to ensure grip and alignment of board to frame.

Back to Gypsum-board room

See also: Gypsum board in Qibla

What the build covers - Gypsum-board room

What the build covers

Galvanised steel frame, screw-fixed boards, embedded services and a surface ready for paint.

  • Steel-stud frame

    Galvanised runners and studs sized to the room height and layout.

  • Electrical and AC routing

    Conduits and cables run through the frame before boards are fixed.

  • Board fixing

    Boards screw-fixed to all walls and ceiling with correct perimeter gaps.

  • Door frame and openings

    Door opening cut and framed with reinforced steel to carry the door frame.

  • Taping and jointing

    Fibre tape and multiple compound coats on every joint for a flat surface.

  • Paint-ready surface

    Light sanding and a final check before handover for painting.

How it works.

  1. Contact and site visit

    Call or WhatsApp us to arrange a site visit at your convenience.

  2. Measurement and layout

    We measure the space and mark service routes and the door position.

  3. Frame installation

    Galvanised runners and studs fixed to floor, slab and adjacent walls.

  4. Services and boarding

    Conduits and cables routed inside the frame before boards are screw-fixed.

  5. Finishing and handover

    Joints taped, surface levelled and room inspected before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Gypsum-board room in Qibla

Call now
Do you divide a large room into two separate units with gypsum board?

Yes, we install a galvanised steel frame and boards from floor to ceiling with openings for doors and windows, plus separate electrical and water runs for each unit.

How long does it take to finish a gypsum-board room from frame to paint?

It depends on room size and required services, but frame installation, boarding and surface finishing follow sequential stages to ensure quality before handover.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works