Tile-over-tile installation in Kuwait - Abbasiya

Tile-over-tile installation in Abbasiya

Tile-over-tile installation in Abbasiya suits refreshing apartment and shop floors quickly and efficiently. We inspect the existing tile surface and bonding, then prepare the base before setting new rows level.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abbasiya comprises mid-rise apartments and ground-floor shops on small, tightly packed plots. Apartment and shop floors are often covered in tiles from different periods, some firmly bonded and others loose or cracked from years of use. We carefully evaluate the current tile condition, clean the surface of dust and moisture, remove any fully detached tiles, then apply adhesive and set new tiles level with a laser guide.

Abbasiya is in Farwaniya governorate, a mixed residential and commercial district with high density.

We confirm service routes beneath the surface before setting new tiles to prevent later damage.

Back to Tile-over-tile installation

See also: Ceramic & porcelain tiling in Abbasiya

What the job covers - Tile-over-tile installation

What the job covers

Assessing the existing tile bed, preparing the surface, and fixing new tiles solid and flat.

  • Existing tile check

    Tap-testing the old tiles to locate hollow or loose areas before starting.

  • Surface preparation

    Degreasing and abrading the glazed surface so adhesive bonds reliably.

  • High-bond adhesive

    Applying a flexible adhesive rated for bonding over an existing ceramic layer.

  • Levelling and alignment

    Using tile levelling clips to keep the new surface flat across the field.

  • Expansion joints

    Leaving perimeter gaps and sealing them with flexible filler suited to Kuwait's heat.

  • Grouting and clean-up

    Grouting joints with a humidity-suited type and cleaning the surface before handover.

How it works.

  1. First contact

    Call or WhatsApp us with the area description and location.

  2. Site inspection

    We visit to measure, tap-test tiles, and assess existing layer condition.

  3. Quotation and approval

    We submit a detailed quote covering materials, labour, and any removal zones.

  4. Preparation and fixing

    Surface abraded, adhesive applied, tiles fixed with levelling clips and expansion joints.

  5. Grouting and handover

    Joints grouted, surface cleaned, and area handed over after adhesive cure period.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Tile-over-tile installation in Abbasiya

Call now
Can new tiles be installed in an apartment without noise and dust for neighbours?

Yes, laying tiles over old ones is far quieter than demolition. We mostly use hand tools, and seal openings and doors to minimise dust drift to neighbouring units.

How long does tile-over-tile installation take in a small apartment?

Duration depends on floor area and old tile condition. Typically inspection and surface prep takes one day, and tile setting itself takes one to two days depending on area.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works